Zhangjiang Tram
| |||||||||||||||
Type: | Tram, Translohr | ||||||||||||||
System: | Zhangjiang Tram | ||||||||||||||
Status: | Closed | ||||||||||||||
Locale: | Pudong, Shanghai | ||||||||||||||
Start: | Zhangjiang metro station | ||||||||||||||
End: | Zhangdong Road Jinqiu Road Station | ||||||||||||||
Linelength: | 9.80NaN0 | ||||||||||||||
Routes: | Zhangjiang metro station ↔ Zhangdong Road Jinqiu Road Station | ||||||||||||||
Character: | At-grade, unreserved tracks in the middle of the road | ||||||||||||||
Depot: | Heqing Town | ||||||||||||||
Stock: | 9 3-car Translohr rubber-tired trams | ||||||||||||||
Stations: | 15 | ||||||||||||||
Daily Ridership: | 6,000 (daily average, 2016)[1] | ||||||||||||||
Gauge: | None, central guide rail | ||||||||||||||
Electrification: | Overhead lines (550 volts) DC | ||||||||||||||
Speed: | max speed of vehicle: 700NaN0 max operating speed: 400NaN0 | ||||||||||||||
Operator: | Shanghai Pudong Modern Rail Transportation Co., Ltd (up to April 1, 2021) Shanghai Pudong New Area Yanggao Public Transportation Co., Ltd. (from April 1, 2021) |
Zhangjiang Tram was a tram network operating in Shanghai that utilised a Translohr system. Shanghai originally had a steel wheeled electric tramway network in its urban center. Routes expanded gradually and reached largest extent in 1925 with 328 tramcars; this tram system shut down in 1975. Tram service returned to Shanghai with the opening of a rubber tired Translohr line in the suburban Zhangjiang Hi-Tech Park in 2010. It is the second rubber-tired tram system in both China and Asia, the first being TEDA tram in Tianjin.
Zhangjiang Tram started construction on December 23, 2007.[2] Construction was originally planned to be completed in December 2008, but this was delayed a year, until December 31, 2009 when it was opened to traffic.[3] Passenger operations started on December 31, 2009. Zhangjiang Tram runs for 10km (10miles) from Zhangjiang Hi-Tech Park Station of the Shanghai Metro Line 2 to Heqing Town with 15 stops. The total investment of the Zhangjiang tram project is about 800 million yuan.[4]
Zhangjiang tram was planned to be built in phases. Only the first phase was constructed and ran from Zhangjiang Hi-Tech Park Station on Shanghai Metro Line 2 (formerly Songtao Road Zuchongzhi Road Station) in the west, to Zhangdong Road Jinqiu Road Station in the east, which covers a distance of, with a total of 15 stops, 1 depot. Initial plans included a next phase which is an extension to Tangzhen and a third phase to Heqing Town, reaching a scale of more than 30km (20miles) by 2010. Due to successive years of losses, the Zhangjiang Tram originally planned extensions are temporarily put on hold. Zhangjiang Tram has an annual loss of more than 20 million yuan. This is because the passenger flow is unbalanced during the day (many office workers are passengers during the rush hour; when commute time is over, there are very few passengers), which is generally unsatisfactory; and the maintenance cost of vehicles is extremely high, as most parts are imported. For this reason, the supply of some parts has been stopped, making the vehicle unable to operate normally.[5]
There were also possible plans to build tram projects in Lujiazui and Sanlin areas, which also have not been materialized.
Ultimately, although spare parts procurement was an issue, the system closed mainly due to the overwhelming saturation of the Zhangjiang area with other, faster rail transit systems, such as Line 2, 11, 13 and 16. After closure, the route was largely replaced by Pudong route 112 bus services.[6] [7] It was the second modern tram system in China to close, after the Zhuhai Tram in January 22, 2021.[8]
The new system was built in Zhangjiang Town, because it is a planned area, and commuting between neighborhoods of the town has always been difficult. The Translohr tramway is constructed in Zhangjiang Town which is in the heartland area of Pudong New Area (east shore of Huangpu River). Due to Economic-Technological Development Area ordinances, sound pollution must be kept to a minimum in this area. Traditional steel-wheeled trams generate much vibration and sound during their journey. Rubber tires on the trams reduce vibration, and as a result noise, substantially. Additionally, the Zhangjiang Town roads are very hilly, and rubber tired trams can more easily climb steeper grades than traditional trams. Another advantage is that rubber-tired trams don't require tracks, as steel wheeled cars do, so there is less disturbance of underground networks like power cables, phone lines, and sewer and water mains.
Timeline:
The modern tram runs from Zhangjiang Hi-Tech Park Station to Zhangdong Road Jinqiu Road Station. Most stops have island platforms. Much of the route runs in the centre of the road, while the two terminals are situated on reserved area. Trams are stored in an indoor facility at the eastern end of the line in Heqing Town. All stations are in Pudong
Routes | Station name | Connections | Distance | |||
---|---|---|---|---|---|---|
M | ||||||
● | Zhangjiang metro station | (adjacent station - Zhangjiang Hi-Tech Park Station) | 0.00 | |||
● | Bibo Road Gaoke Road Station | |||||
● | Huatuo Road Daerwen Road Station | |||||
● | Huatuo Road Keyuan Road Station | |||||
● | Cailun Road Jinke Road Station | |||||
● | Cailun Road Halei Road Station | |||||
● | Gebaini Road Libing Road Station | |||||
● | Ziwei Road Gaosi Road Station | |||||
● | Gaosi Road Zhangjiang Road Station | |||||
● | Zhangjiang Middle School Station | |||||
● | Guanglan Road Zuchongzhi Road Station | (adjacent station - ) | ||||
● | Guanglan Road Dangui Road Station | |||||
● | Dangui Road Qingtong Road Station | |||||
● | Dangui Road Zhangdong Road Station | |||||
● | Zhangdong Road Jinqiu Road Station | 9.8 | ||||
The rolling stock is Translohr. It consists of 9 multiple units (price of 30 million yuan each) of three cars each. They are low floor, fully air conditioned, and can operate at high speeds up to . Each train is generally composed of 3 cars, 25m (82feet) long and 2.2m (07.2feet) wide. It can take more than 160 people, and a train can be increased to 5 cars according to demand. After the opening, there were 12 cars on the whole line, every 6 minutes or so.