Zaporizhzhia thermal power station | |
Coordinates: | 47.5086°N 34.6256°W |
Country: | Ukraine |
Location: | Enerhodar, Zaporizhzhia Oblast |
Status: | Operational |
Construction Began: | 1971 |
Commissioned: | 1972[1] |
Owner: | Dniproenergo |
Operator: | DTEK |
Th Fuel Primary: | Coal |
Th Fuel Secondary: | Natural gas |
Th Fuel Tertiary: | Fuel oil |
Ps Units Operational: | 2 x 300 MW 2 x 325 MW 2 x 800 MW |
Ps Units Manu Model: | TAGMET Electrotyazhmash LMZ Electrosila |
Ps Electrical Capacity: | 2,850 MW |
Zaporizhzhia thermal power station is a large thermal power plant (DRES) in the purpose-built city of Enerhodar in Ukraine. It is the most powerful thermal power station in Ukraine, with an installed capacity of 2,850 MWe. Its primary fuel is coal. It can also fire natural gas and fuel oil,[2] and has tank storage for these reserve fuels adjacent to the coal bunkers.
The plant was built by the Soviet Union between 1971 and 1977.[2]
The plant has two 320m (1,050feet) tall flue-gas stacks, which are among the tallest free-standing structures in Ukraine.[3] The plant is not equipped with any flue gas desulphurization systems, and uses electrostatic precipitators to remove fly ash prior to the flue gas being exhausted via one of the two chimneys. Like many other coal-fired generating stations, the Zaporizhzhia site encompasses an ash pond. Coal ash from the boilers is delivered by pipe to the 135 hectare (333 acre) pond where it is disposed of.
The plant supplies power to the southern regions of Ukraine.[2] Some of the power is transmitted from its substation through the Enerhodar Dnipro Powerline Crossing to the north side of the Kakhovka Reservoir.
On 4 March 2022, the thermal plant and the adjacent Zaporizhzhia Nuclear Power Plant were captured by Russian forces during the Russian invasion of Ukraine. On 5 May 2022, the thermal power plant stopped operating after it ran out of coal, as it was unable to get further deliveries due to the invasion.[4]
As of January 1, 2021, the installed capacity is 2,850 MW:
A third 800 MW unit (number 6) has been decommissioned.
A small 1 MW grid battery was added in 2021 to test grid services.[5]
On February 3, 2021, the entire city of Enerhodar, as well as several neighboring towns lost power. This was caused by an accident at the Zaporizhzhia thermal power station, where, according to the officials, power output of the plants units dropped to zero.
According to Centrenergo, the plant's operator:
In order to balance the system, power unit No. 10 of the Krivorozhskaya TPP was taken out of repair ahead of schedule. At the command of NEC Ukrenergo, power units No. 9 and 12 of Burshtynskaya TPP and No. 7 of Dobrotvorskaya TPP were synchronized to the grid and began supplying power.[6]