Xuzhou Metro Explained

Xuzhou Metro
Imagesize2:275px
Owner:Xuzhou Metro Group
Locale:Xuzhou, Jiangsu, China
Transit Type:Rapid transit
Lines:3 (another 3 lines under construction)
Stations:54
Ridership:256,700 (31 December 2020 record)
Annual Ridership:7.5 million (2019)
Began Operation:[1]
Operator:Xuzhou City Rail Transit Co., Ltd.
System Length:72.48km (45.04miles)
El:1.5 kV DC overhead lines
Map State:collapsed
Website:http://xzgdjt.com/
Character:Underground, elevated
Native Name:Chinese: 徐州地铁

The Xuzhou Metro is a rapid transit system in Xuzhou, Jiangsu Province, China. Construction began in February 2014, and Line 1 was opened on September 28, 2019, Line 2 was opened on November 28, 2020, and Line 3 was opened on June 28, 2021.

By 2020, the network is scheduled to comprise three lines with a total length of about . The total investment is expected to be 44.3 billion renminbi.[2] [3] The system is planned to comprise 11 lines and of track when fully built out.[4]

In its first year of operation the ridership was 7.5 million (2019).

Lines in operation

data-sort-type="text"style="width:120px;"LineTerminals
(District)
CommencementNewest
Extension
Length
km
Stations

(Tongshan)

(Jiawang)
28 September 201921.97[5] 18

(Tongshan)

(Jiawang)
28 November 202024.2520

(Gulou)

(Tongshan)
28 June 20213 December 202426.2622
Total72.4860

Line 1

See main article: Line 1 (Xuzhou Metro). Line 1 began construction in February 2014. The first phase is 21.967sigfig=3NaNsigfig=3[5] in length, and has 18 stations (17 underground and one elevated). It runs from Luwo in the west to Xuzhoudong Railway Station in the east.[6] In June 2018, the civil engineering construction work was reported to be 95% complete, leaving mostly track laying, decorations, and electromechanical installations to be completed.[7] On August 30, 2018, railway work was declared complete, and electromechanical installations and decorations was in prgoress.[8]

Line 1 opened on September 28, 2019. it runs in an east–west direction, stretching from Luwo Station in Tongshan District in the west to Xuzhoudong Railway Station in Jiawang District in the east. The line traverses Quanshan District, Gulou District, and Yunlong District, serving as a vital corridor for east–west passenger traffic within Xuzhou City. It connects key areas in downtown Xuzhou, the Bashan Area, and Chengdong New District to commercial hubs like People's Square, Pengcheng Square, Huaihai Square, and Wanda Plaza, facilitating rapid access to Xuzhou Railway Station and Xuzhoudong Railway Station, the city's major transportation hubs.

As of November 2020, Line 1 spans a total length of 21.97 km (13.65 mi), with 0.571 km (0.355 mi) of the line being elevated, 20.996 km (13.046 mi) underground, and 0.4 km (0.25 mi) at-grade. The line comprises a total of 18 stations, including one elevated station and 17 underground stations. Line 1 operates with six-section B-type trains. By November 2020, the average daily ridership on Line 1 stood at 56,500, with a single-day ridership peak of 150,000 recorded on October 2, 2019. In 2020, the annual ridership on Line 1 reached 19 million passengers.

Line 2

See main article: Line 2 (Xuzhou Metro). Line 2, opened on November 28, 2020, spans a length of 24.25 kilometers (15.07 mi) and features 20 underground stations. This line operates entirely underground and represents the second metro line to open in Xuzhou city. Serving as a pivotal north–south to east–west backbone, Xuzhou Metro Line 2 traverses the old city and Xuzhou New District, encompassing the north and southeast passenger traffic zones of the city. It facilitates connectivity between the Jiulishan area, the old city, and the new city.

Line 3

See main article: Line 3 (Xuzhou Metro). Line 3 commenced operations on June 28, 2021, with an initial phase spanning 18.13 kilometers (11.27 mi)[9] [10] and featuring 16 underground stations, including two transfer stations. This line operates between Xiadian and Gaoxinqunan, linking the North Zone, Central Zone, and South Zone of Xuzhou city.[6]

Line 3 is colored “Technological Blue”, selected in a poll.

Lines under construction

data-sort-type="text"style="width:100px;"LineTerminalsCommencementLength
km
Stations
Under construction29.419
Under construction24.620
Under construction22.915<--Line 7 & Other lines & extensions are not approved by National Development and Reform Commission (NDRC)-->

Line 6

Line 6 is planned to be 22.9km (14.2miles) long in its first phase with 16 stations. It will run between Tongshan Traditional Chinese Medicine Hospital Station and Xuzhoudong Railway Station.[11] It is planned to open in September 2025. Line 6 will use fully automated trains operating in GoA4 mode.[12]

Future development

Second phase

Construction is planned begin on the second phase of the Xuzhou Metro, including Line 4, Line 5, Line 6, and the second phase of Line 3. Construction is expected to be completed in 2024. The second phase will add 79.3km (49.3miles) to the system.[13]

Line 4 is planned to be 25.4km (15.8miles) long with 19 underground stations. It will run between Tuolanshan and Qiaoshangcun.[14]

Line 5 is planned to be 24.6km (15.3miles) long with 20 underground stations. It will run between Olympic Sports Center South and Xukuangcheng.

Line 6 is planned to be 22.9km (14.2miles) long with 15 underground stations. It will run between Huangshanlu and Xuzhoudong Railway Station.

These lines was approved by the National Development and Reform Commission on January 20, 2020.[13]

Third phase

The third phase of metro lines, currently in the planning stage, will finalize the plans for the Xuzhou Metro, consisting of 7 urban metro lines and 4 suburban lines. This phase will encompass the extension of Line 1 and Line 2 into their second phases, the full development of Line 7, and the incorporation of suburban lines S1, S2, S3, and S4 into the expanding metro network of Xuzhou.

Notes and References

  1. Web site: 徐州地铁1号线一期9月28日10:00正式开通. 2019-09-26. September 26, 2019. September 26, 2019. https://web.archive.org/web/20190926191611/http://xzgdjt.com/news/show-3842.html. dead.
  2. News: http://js.people.com.cn/html/2014/02/13/288349.html . zh:徐州城市轨道交通规划获批 地铁1号线今开建 . 23 February 2014 . People's Daily . zh . March 22, 2015 . March 4, 2016 . https://web.archive.org/web/20160304031643/http://js.people.com.cn/html/2014/02/13/288349.html . dead .
  3. Web site: 中国国际工程咨询有限公司 媒体聚焦 徐州市轨道交通建设规划获批 一号线下月开工. 2021-02-06. www.ciecc.com.cn.
  4. Web site: Xuzhou ditie zuixinxiaoxi! Yihao xian mingnian Shiyue tongche!. 2018-09-22. Xuzhou Metro Loop. zh:徐州地铁最新消息!1号线明年10月通车!. Xuzhou Metro latest news! Line 1 will open to traffic in October next year!. 2018-09-22.
  5. Web site: 定了,徐州地铁1号线6月7日试运行!. 2019-05-06.
  6. News: http://www.xz.gov.cn/zgxz/014/20141225/014004001_385f33b6-bbc8-495f-a99d-490bc26a88c3.htm . zh:徐州轨道交通工程加速建设 . 25 December 2014 . Xuzhou Government . zh . March 22, 2015 . March 4, 2016 . https://web.archive.org/web/20160304052620/http://www.xz.gov.cn/zgxz/014/20141225/014004001_385f33b6-bbc8-495f-a99d-490bc26a88c3.htm . dead .
  7. Web site: Guidao gongsi zuzhi meiti jizhong baodao yihao xian jianshe jinzhan qingkuang. 2018-06-06. Xuzhou Rail Transit. zh. zh:轨道公司组织媒体集中报道1号线建设进展情况. The railway company organized the media to report on the construction progress of Line 1. 2018-07-19. July 19, 2018. https://web.archive.org/web/20180719233308/http://www.xzgdjt.com/news/show-3181.html. dead.
  8. Web site: Guidaojiaotong yihao xian yi qi gongcheng shunli shixian "gui tong". 2018-08-30. Xuzhou Rail Transit. zh. zh:轨道交通1号线一期工程顺利实现"轨通". Smooth implementation of railway on Metro Line 1. 2018-08-30. August 30, 2018. https://web.archive.org/web/20180830174351/http://www.xzgdjt.com/news/show-3287.html. dead.
  9. Web site: 定了!徐州地铁三号线28号上午开通. 2021-06-24.
  10. Web site: 建设进入新阶段 徐州地铁3号线首台盾构机始发. 2018-01-09.
  11. Web site: 关于徐州市城市轨道交通3号线二期、6号线一期工程车站命名的公告 . https://archive.today/20230503100326/https://mz.xz.gov.cn/govxxgk/014051466/2022-10-19/b973d078-7839-4f50-8d8a-62053463a4e7.html . 2023-05-03.
  12. Web site: 徐州地铁-徐州市城市轨道交通6号线一期工程全自动运行系统设计和运营咨询服务招标公告(资格后审). 2021-02-06. www.xzdtjt.com.
  13. Web site: 国家发展改革委关于江苏省徐州市城市轨道交通第二期建设规划(2019-2024年)的批复. 2020-02-11.
  14. Web site: 徐州市城市轨道交通第二期建设规划(2019-2024年). 2020-02-10. 2020-01-20.