Diabari Depot Explained

Diabari Depot
Coordinates:23.878°N 90.3558°W
Owner:Road Transport and Highways Division
Operator:Dhaka Mass Transit Company Limited
Roads:Sonargaon Janapath, Mirpur Road
Rollingstock:Kawasaki Railcar Manufacturing
Type:At-Grade
Opened:June 2022

Diabari Depot (bn|দিয়াবাড়ি ডিপো), officially Uttara Depot (bn|উত্তরা ডিপো), is a railway depot of the Dhaka Metro Rail's MRT Line 6, located before Uttara North station in northern Dhaka. It is the first depot on the metro lines of Dhaka, having been built in 2022, when the MRT Line 6 was under construction.

History

On 27 March 2016, DMTCL signed an agreement with Tokyu Construction Ltd for the development of the line's depot.[1] The depot is planned to be built on 59 acres of land in the third phase of the Uttara Satellite Town project. As the 30 acres of the depot area is soft, the 8 adjacent buildings were at risk from the tremors generated during construction of the depot structure using sand conception piling, which the Japan International Cooperation Agency promised to compensate if damaged.[2] In September 2016, works related to the construction of the line's depot at Diabari were started.[3] Construction of the structures of the depot was entrusted to Italian-Thai Development and Sinohydro in 2017.[4] Construction of the structures of the depot began on 13 September 2017. Land development work of the depot was completed on 31 January 2018.[5] The administrative building at the depot was complete in 2021.[6] Its construction was complete in June 2022.[7]

Layout

The depot area also has 52 structures including workshops, washing sheds and storage. The depot can accommodate 18 trains, which have to go north from Uttara North metro station through a 300 metres long workshop to reach the depot.[8] The depot has an operation control center from where trains can be controlled by communicating with the train driver using radio antennas mounted on the line under the direction of the controller.[9] The depot area has been greened by planting trees.[10]

Metro Rail Exhibition and Information Center

It was known that an exhibition and information center was designed by Japan International Cooperation Agency to be set up so that people could experience the metro services. Its main purpose was to preserve the memory of died Japanese officials worked for the MRT Line 6 during July 2016 Dhaka attack. By September 2019, Dhaka Mass Transit Company Limited chose the site for the proposed center beside the depot entrance.[11] In February 2020, A sample train for the center arrived in Dhaka. It was supposed to open in March 2020.[12] Later the date was changed to January 2022.[13] On 24 July 2022, a memorial plaque placed on the center in memory of seven Japanese official of MRT Line 6 construction project died in July 2016 Dhaka attack was inaugurated by Road Transport and Bridge minister Obaidul Quader. In August 2022, it was reported that the Metro Rail Exhibition and Information Centre may be opened for public in September 2022.[14] Then it was opened on 6 September 2022.[15]

Controversy

On 1 March 2024, DMTCL invited tenders for the appointment of operators to run the 7,580 sqare feet staff canteen at the depot. In March, the company issued a tender notice to Khandkar Enterprises for an annual rent of .[16] The news of the tender issue drew criticism. However, according to M.A.N. Siddique, DMTCL Managing Director, as no interested contractor was found in September 2023, the finalized contractor has been appointed in charge of the canteen at a lower price in this year's open tender.[17] Later, when a writ was filed in the High Court challenging the validity of this decision, ABM Amin Ullah Nuri, the concerned secretary, was directed to submit the inquiry report to the court within one month.[18] The inquiry report submitted in June noted that the staff canteen is non-commercial and its fare is justified considering its customers.[19]

Notes and References

  1. News: Deal struck for part of metro rail project. 27 March 2016. 8 September 2023. The Daily Star. 8 September 2023. https://web.archive.org/web/20230908140359/https://www.thedailystar.net/city/deal-struck-part-metro-rail-project-1200355. live.
  2. Web site: মেট্রোরেলের ডিপো নির্মাণে ঝুঁকিতে আট স্থাপনা. bn. 11 January 2016. 1 October 2024. Bdnews24.com. https://web.archive.org/web/20160113013656/https://bangla.bdnews24.com/bangladesh/article1087137.bdnews. 13 January 2016. live.
  3. Web site: https://www.newsbangla24.com/news/217548/Abdul-Monem-is-the-only-domestic-company-in-the-construction-of-metrorail . bn:মেট্রোরেল নির্মাণে দেশীয় একমাত্র প্রতিষ্ঠান আব্দুল মোনেম . bn . Farhan . Ferdous . 30 December 2022 . 16 May 2023 . Newsbangla24.com . 16 May 2023 . https://web.archive.org/web/20230516084201/https://www.newsbangla24.com/news/217548/Abdul-Monem-is-the-only-domestic-company-in-the-construction-of-metrorail . live.
  4. News: মেট্রোরেলের পথ, স্টেশন, ডিপোর অবকাঠামো নির্মাণে চুক্তি সই. bn. 4 May 2017. 2 October 2024. Prothom Alo. https://web.archive.org/web/20241124184604/https://www.prothomalo.com/bangladesh/%E0%A6%AE%E0%A7%87%E0%A6%9F%E0%A7%8D%E0%A6%B0%E0%A7%8B%E0%A6%B0%E0%A7%87%E0%A6%B2%E0%A7%87%E0%A6%B0-%E0%A6%AA%E0%A6%A5-%E0%A6%B8%E0%A7%8D%E0%A6%9F%E0%A7%87%E0%A6%B6%E0%A6%A8-%E0%A6%A1%E0%A6%BF%E0%A6%AA%E0%A7%8B%E0%A6%B0-%E0%A6%85%E0%A6%AC%E0%A6%95%E0%A6%BE%E0%A6%A0%E0%A6%BE%E0%A6%AE%E0%A7%8B-%E0%A6%A8%E0%A6%BF%E0%A6%B0%E0%A7%8D%E0%A6%AE%E0%A6%BE%E0%A6%A3%E0%A7%87. 24 November 2024. live.
  5. News: মেট্রোরেল নির্মাণে সাত ঠিকাদারি প্রতিষ্ঠান. Seven contracting companies in construction of Metro Rail. bn. 28 December 2022. 3 October 2024. Bonik Barta. 28 December 2022. https://web.archive.org/web/20221228064905/https://bonikbarta.net/home/news_description/325201/%E0%A6%AE%E0%A7%87%E0%A6%9F%E0%A7%8D%E0%A6%B0%E0%A7%8B%E0%A6%B0%E0%A7%87%E0%A6%B2-%E0%A6%A8%E0%A6%BF%E0%A6%B0%E0%A7%8D%E0%A6%AE%E0%A6%BE%E0%A6%A3%E0%A7%87-%E0%A6%B8%E0%A6%BE%E0%A6%A4-%E0%A6%A0%E0%A6%BF%E0%A6%95%E0%A6%BE%E0%A6%A6%E0%A6%BE%E0%A6%B0%E0%A6%BF-%E0%A6%AA%E0%A7%8D%E0%A6%B0%E0%A6%A4%E0%A6%BF%E0%A6%B7%E0%A7%8D%E0%A6%A0%E0%A6%BE%E0%A6%A8. live.
  6. News: মেট্রোরেলের সাবেক এমডি’র আয়েশে গচ্চা সাড়ে সাত কোটি. bn. Nazmul. Huda. 16 October 2024. 19 October 2024. Manab Zamin. 6 November 2024. https://web.archive.org/web/20241106013826/https://mzamin.com/news.php?news=131833. live.
  7. Web site: Uttara-Agargaon Metro Rail work nears completion. Jahidul. Islam. 7 July 2022. 2 July 2023. The Business Standard. 7 July 2022. https://web.archive.org/web/20220707170052/https://www.tbsnews.net/bangladesh/uttara-agargaon-metro-rail-work-nears-completion-455158. live.
  8. News: Metro rail depot nears completion . 17 February 2021 . 19 June 2023 . . 27 January 2022 . https://web.archive.org/web/20220127210509/https://www.tbsnews.net/bangladesh/infrastructure/metro-rails-operations-start-next-victory-day-mannan-203383 . live.
  9. News: https://www.prothomalo.com/technology/e5t9zoe6r2 . bn:প্রযুক্তির চমক মেট্রোরেলে . bn . Anwar . Hossain . 24 December 2022 . 26 December 2022 . . 25 December 2022 . https://web.archive.org/web/20221225150657/https://www.prothomalo.com/technology/e5t9zoe6r2 . live.
  10. Web site: মেট্রো রেল ডিপো ও বিভাজকে সবুজায়নের পরিকল্পনা. bn. Ariful Islam. Mithu. 27 December 2022. 1 October 2024. The Business Standard.
  11. Web site: মেট্রোরেল ৬ কিমি দৃশ্যমান, হচ্ছে প্রদর্শনী সেন্টার. bn. Mafizul. Sadiq. 9 September 2019. 1 October 2024. Banglanews24.com. 5 December 2019. https://web.archive.org/web/20191205052216/https://www.banglanews24.com/national/news/bd/738692.details. live.
  12. News: https://www.dhakatimes24.com/2020/02/17/152439/%E0%A6%AE%E0%A7%87%E0%A6%9F%E0%A7%8D%E0%A6%B0%E0%A7%8B%E0%A6%B0%E0%A7%87%E0%A6%B2%E0%A7%87%E0%A6%B0-%E0%A6%AA%E0%A7%8D%E0%A6%B0%E0%A6%A5%E0%A6%AE-%E0%A6%A8%E0%A6%AE%E0%A7%81%E0%A6%A8%E0%A6%BE-%E0%A6%95%E0%A7%8B%E0%A6%9A-%E0%A6%A2%E0%A6%BE%E0%A6%95%E0%A6%BE%E0%A7%9F . bn:মেট্রোরেলের প্রথম নমুনা কোচ ঢাকায় . First sample coach of Metro Rail in Dhaka . bn . 17 February 2020 . 20 May 2023 . Dhaka Times . 15 August 2020 . https://web.archive.org/web/20200815112713/https://www.dhakatimes24.com/2020/02/17/152439/%E0%A6%AE%E0%A7%87%E0%A6%9F%E0%A7%8D%E0%A6%B0%E0%A7%8B%E0%A6%B0%E0%A7%87%E0%A6%B2%E0%A7%87%E0%A6%B0-%E0%A6%AA%E0%A7%8D%E0%A6%B0%E0%A6%A5%E0%A6%AE-%E0%A6%A8%E0%A6%AE%E0%A7%81%E0%A6%A8%E0%A6%BE-%E0%A6%95%E0%A7%8B%E0%A6%9A-%E0%A6%A2%E0%A6%BE%E0%A6%95%E0%A6%BE%E0%A7%9F . live.
  13. News: Metro rail exhibition, info centre to open in January . 17 November 2021 . 18 June 2023 . . 24 November 2021 . https://web.archive.org/web/20211124050633/https://www.thedailystar.net/news/bangladesh/news/glimpse-whats-come-2231991 . live.
  14. Web site: সেপ্টেম্বরে খুলতে পারে মেট্রোরেলের প্রদর্শনী ও তথ্যকেন্দ্র. bn. 2 August 2022. 1 October 2024. Bangla Tribune. 23 September 2022. https://web.archive.org/web/20220923124356/https://www.banglatribune.com/others/756271/%E0%A6%B8%E0%A7%87%E0%A6%AA%E0%A7%8D%E0%A6%9F%E0%A7%87%E0%A6%AE%E0%A7%8D%E0%A6%AC%E0%A6%B0%E0%A7%87-%E0%A6%96%E0%A7%81%E0%A6%B2%E0%A6%A4%E0%A7%87-%E0%A6%AA%E0%A6%BE%E0%A6%B0%E0%A7%87-%E0%A6%AE%E0%A7%87%E0%A6%9F%E0%A7%8D%E0%A6%B0%E0%A7%8B%E0%A6%B0%E0%A7%87%E0%A6%B2%E0%A7%87%E0%A6%B0-%E0%A6%AA%E0%A7%8D%E0%A6%B0%E0%A6%A6%E0%A6%B0%E0%A7%8D%E0%A6%B6%E0%A6%A8%E0%A7%80-%E0%A6%93. live.
  15. News: Road Transport and Bridges Minister Obaidul Quader along with others offers a munajat after inaugurating Metro Rail Exhibition and Information Centre at Diabari in the capital on Tuesday. Ambassador of Japan to Bangladesh ITO Naoki was present. —SUN PHOTO . 7 September 2022 . 18 June 2023 . . 3 July 2023 . https://web.archive.org/web/20230703081851/https://www.daily-sun.com/printversion/details/642795/Road-Transport-and-Bridges-Minister-Obaidul-Quader-along-with-others-offers-a-munajat-after-inaugurating-Metro-Rail-Exhibition-and-Information-Centre-at-Diabari-in-the-capital-on-Tuesday.-Ambassador-of-Japan-to-Bangladesh-ITO-Naoki-was-present.-%E2%80%94SUN-PHOTO . live .
  16. Web site: সাড়ে ৭ হাজার বর্গফুট স্টাফ ক্যান্টিন ১ হাজার টাকায় ভাড়া দিয়েছে ডিএমটিসিএল. bn. 16 March 2024. 1 October 2024. Bangla Tribune.
  17. News: সাড়ে ৭ হাজার বর্গফুটের ক্যানটিনের ভাড়া মাত্র ১ হাজার টাকা, যা বললেন মেট্রোরেল ব্যবস্থাপক. bn. 17 March 2024. 1 October 2024. Ajker Patrika. https://web.archive.org/web/20241124190612/https://www.ajkerpatrika.com/bangladesh/dhaka/ajpkrlwtbu0tc. 24 November 2024. live.
  18. News: ১ হাজার টাকায় মেট্রোরেলের ৭৫৮০ বর্গফুট ক্যান্টিন ভাড়া, অনুসন্ধানের নির্দেশ হাইকোর্টের. bn. 21 March 2024. 1 October 2024. The Daily Star. 18 April 2024. https://web.archive.org/web/20240418050955/https://bangla.thedailystar.net/news/bangladesh/news-569156. live.
  19. News: ‘সৌজন্য ভাড়া’ হিসাবে মাসিক ১ হাজার টাকা অযৌক্তিক নয়: তদন্ত কমিটি. bn. 10 June 2024. 1 October 2024. Prothom Alo. 3 September 2024. https://web.archive.org/web/20240903160907/https://www.prothomalo.com/bangladesh/capital/3qxklh46xq. live.