Singasandra metro station explained

Singasandra
Style:Namma Metro
Address:Wellington Paradise, Begur, Bengaluru, Karnataka 560068
Coordinates:12.8807°N 77.645°W
Structure:Elevated, Double track
Platform:Side platform
Platform-1 → / Rashtreeya Vidyalaya Road
Platform-2 → Bommasandra
Levels:(TBC)
Tracks:2
Parking:(TBC)
Opening: (TBC)
Electrified:750 V DC third rail
Accessible:(TBC)
Status:Final Stages before Operations
Code:(TBC)
Owned:Bangalore Metro Rail Corporation Ltd (BMRCL)
Operator:Namma Metro
Map State:collapsed
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:14

Singasandra is an upcoming elevated metro station on the North-South corridor of the Yellow Line of Namma Metro in Bangalore, India.

As per latest reports, the Yellow Line is slated to be operational between 2nd & 4th weeks of January 2025[1] due to lots of trial runs along with more trainsets which are needed for commencement of operations.[2] [3] [4] [5] [6]

History

In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Singasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[7] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.

Station layout

Station Layout (TBC)

GStreet levelExit/Entrance
valign=topL1valign=topMezzaninevalign=topFare control, station agent, Metro Card vending machines, crossover
L2Side platform Doors will open on the left
Platform 2
Southbound
Towards → Bommasandra
Next Station: Hosa Road
Platform 1
Northbound
Towards ← / Rashtreeya Vidyalaya Road
Next Station: Kudlu Gate
Side platform Doors will open on the left
L2

See also

External links

Notes and References

  1. Web site: Bengaluru: Yellow Line safety clearance by December end, opening after second week of January . 2024-10-29 . Deccan Herald . en.
  2. Web site: 2024-03-09 . Bengaluru Metro's Yellow Line to Open in November 2024, Tejasvi Surya Shares Key Details . 2024-03-10 . TimesNow . en.
  3. Web site: DHNS . Bengaluru metro's Yellow Line to start only after general elections . 2023-12-14 . Deccan Herald . en.
  4. Web site: RV Road-Bommasandra Metro stretch to open by April: CM Siddaramaiah . 2023-11-11 . The New Indian Express.
  5. News: 2023-10-21 . Metro Yellow Line to E-City & extended Green Line to open by April 2024: CM Siddramaiah . 2023-11-11 . The Times of India . 0971-8257.
  6. Web site: 2023-10-06 . Bengaluru metro's yellow line connecting Bommasandra to Silk Board to open by February 2024, says MP Tejasvi Surya . 2023-11-11 . Hindustan Times . en.
  7. Web site: 2017-04-25 . ITD-ITD Cem JV Lowest Bidder for B’lore Metro’s Hosa Rd - HSR Layout . 2024-10-24 . The Metro Rail Guy . en-US.