Country: | IND |
Ragigudda - Silk Board Flyover | |
Location: | Bangalore, India |
Coord: | 12.9169°N 77.5904°W |
Roads: | Marenahalli Road Outer Ring Road 100 Feet Ring Road |
Type: | A Double-Stacked Overpass |
Lanes: | 4 |
Opened: | (TBC) [1] |
Contractor: | Bangalore Metro Rail Corporation Ltd (BMRCL) |
Height: | 31m (102feet) |
Raggigudda-Silk Board Flyover is a rail-cum-road flyover under construction in the city of Bengaluru in Karnataka, India.[2] It is the first double decker flyover in Bengaluru, which is being built by the Bangalore Metro Rail Corporation Limited between Central Silk Board and Ragigudda as part of the RV Road-Bommasandra Metro line (Reach-5). After completion, it will become the tallest rail-cum-road flyover in South India, which is expected to be inaugurated in December 2024.[3]
The flyover has two levels above ground, with the first level having four lanes for carrying vehicles while the second level carries the metro tracks. The total length of the flyover is 3.2 kilometres long. At 31 metres tall, it is tallest rail-cum-road flyover in South India.[4]