Pulau Muara Besar Bridge Explained

Pulau Muara Besar Bridge
Native Name:Jambatan Pulau Muara Besar
Native Name Lang:ms
Coordinates:5.005°N 115.0759°W
Carries:Motor vehicles
Crosses:Brunei Bay
Locale:Serasa, Brunei-Muara, Brunei
Length:26800NaN0
Width:230NaN0
Lanes:4
Builder:China Harbour Engineering Company
Begin:May 2015
Complete:May 2018
Cost:B$260 million (US$204 million)

Pulau Muara Besar Bridge is a dual-carriageway bridge which connects Pulau Muara Besar (PMB), an island on Brunei Bay, with the mainland of Brunei via Serasa in Brunei-Muara District.[1] [2]

Construction

By linking PMB to the mainland at Serasa, the bridge is anticipated to facilitate utility connectivity as well as the island's industrial growth. A Korean–Brunei collaboration was chosen to provide project consulting in August 2012 following an open procurement in 2011. The bridge's original concept was for it to connect to a proposed 4km (02miles) road that would travel to an industrial location on the eastern end of the island, crossing Brunei Bay 2.8km (01.7miles) from Serasa industrial park to the southwest side of PMB. After stakeholder talks to establish bridge and utility standards, engineering design work was scheduled, and by late 2012, a request for proposal for construction was anticipated.[3]

The construction began in 2015 and completed in May 2018;[4] it was undertaken by China Harbour Engineering Company at a cost of B$260 million or US$204 million.[5] [6] The bridge is part of the road infrastructure that will serve the petrochemical refinery plant on the island, which is currently under construction, and is a Chinese foreign direct investment.[7] [8] Upon completion, the bridge is 2680m (8,790feet) long and 23m (75feet) wide.[9] At present, access to the bridge is restricted to authorised personnels of the project.[10]

References

  1. Web site: Brunei: Pulau Muara Besar Bridge nears completion. www.worldhighways.com. 2018-03-19.
  2. Web site: PMB bridge project goes to Chinese contractor The BT Archive. btarchive.org. 2018-03-19.
  3. Book: BRUNEI MUARA DISTRICT PLAN . January 2015 . . Bandar Seri Begawan . 3-27.
  4. Web site: PMB Bridge Was Recently Completed In May 2018 Brunei's No.1 News Website. www.brudirect.com. 2018-08-04.
  5. Web site: CHEC to complete Brunei’s Pulau Muara Besar Bridge by next April_Xinhua Finance Agency. en.xfafinance.com. 2018-03-19.
  6. Web site: China Harbor Engineering picks up Brunei’s Muara Besar project. www.worldhighways.com. 2018-03-19.
  7. Web site: Hengyi invests USD 12 billion for Pulau Muara Besar second phase Biz Brunei. www.bizbrunei.com. en-GB. 2018-08-04.
  8. Web site: A look at Hengyi’s Pulau Muara Besar project Borneo Bulletin Online. borneobulletin.com.bn. en-US. 2018-08-04.
  9. Web site: Main span of China-made bridge closed in Brunei - Xinhua English.news.cn . dead . https://web.archive.org/web/20171227173957/http://www.xinhuanet.com/english/2017-12/27/c_136855800.htm . December 27, 2017 . 2018-03-19 . www.xinhuanet.com.
  10. Web site: Access restricted to PMB Bridge Borneo Bulletin Online. borneobulletin.com.bn. en-US. 2018-08-04.