Pong Dam | |
Location Map: | India |
Coordinates: | 31.9714°N 75.9467°W |
Country: | India |
Location: | Talwara |
Status: | O |
Construction Began: | 1961 |
Opening: | 1974 |
Owner: | Bhakra Beas Management Board |
Dam Type: | Embankment, earth-fill |
Dam Height: | 1330NaN0 |
Dam Length: | 19510NaN0 |
Dam Width Crest: | 13.720NaN0 |
Dam Width Base: | 6100NaN0 |
Dam Volume: | 355000000NaN0[1] |
Dam Elevation Crest: | 435.860NaN0 |
Dam Crosses: | Beas River |
Spillway Count: | 6 x radial gates |
Spillway Type: | Overflow gated chute |
Spillway Capacity: | 123750NaN0 |
Res Name: | Maharana Pratap Sagar |
Res Capacity Total: | 85700000000NaN0 (302.69 tmc ft) |
Res Capacity Active: | 72900000000NaN0 (257.48 tmc ft) |
Res Catchment: | 125600NaN0 |
Res Surface: | 2600NaN0 |
Res Elevation: | 426.720NaN0 |
Res Max Length: | 41.80NaN0 |
Plant Hydraulic Head: | 95.10NaN0[2] |
Plant Commission: | 1978-1983[3] |
Plant Turbines: | 6 x 66 MW Francis-type |
Plant Capacity: | 396 MW |
The Pong Dam, also known as the Beas Dam, is an earth-fill embankment dam on the Beas River in the state of Himachal Pradesh, India, just upstream of Talwara. The purpose of the dam is water storage for irrigation and hydroelectric power generation.[4] As the second phase of the Beas Project, construction on the dam began in 1961 and was completed in 1974. At the time of its completion, the Pong Dam was the tallest of its type in India.[3] The lake created by the dam, Maharana Pratap Sagar, became a renowned bird sanctuary.[5]
The idea for a dam on the Beas at the Pong site was first proposed in 1926 and subsequent surveys of the Indus River and its tributaries were ordered by the Punjab Government in 1927. Interest in the dam declined after the report deemed the project difficult because of flood waters. In 1955, geological and hydrological studies were carried out on the Pong site and an embankment design was recommended. In 1959, extensive studies were carried out and recommended an embankment dam with a gravity section. A final design was issued and construction began in 1961 on the dam which was called Beas Project Unit II - Beas Dam. The Pandoh Dam 1400NaN0 upstream being the Beas Project Unit I.[6] It was completed in 1974 and the power station was later commissioned between 1978 and 1983.[1] [3] About 150,000 people were displaced by the dam's large reservoir under a poorly planned and executed relocation program.[7]
The Pong Dam is a 1330NaN0 tall and 19510NaN0 long earth-fill embankment dam with a gravel shell. It is 13.720NaN0 wide at its crest and 6100NaN0 wide at its base. The total volume of the dam is 355000000NaN0 and its crest sits at an elevation of 435.860NaN0 above sea level. The dam's spillway is located on its southern bank and is a chute-type controlled by six radial gates. Its maximum discharge capacity is 123750NaN0. The reservoir created by the dam, Maharana Pratap Sagar, has a gross capacity of 85700000000NaN0 of which 72900000000NaN0 is active (live) capacity. The reservoir has a normal elevation of 426.720NaN0 and catchment area of 125600NaN0. The reservoir reaches from the dam to 41.80NaN0 upstream in length and covers a surface of 2600NaN0.[1] Located at the base of the dam is its power house. It is supplied with water via three penstocks which each meet a 66 MW Francis turbine-generator located inside the Bhatoli phakorian. The dam's elevation to the power house provides a maximum of 95.10NaN0 in hydraulic head.[2]
The large reservoir created by this dam resulted in a major displacement of people from the state of Himachal Pradesh. A total of 90,702 people were displaced and 339 villages affected.[8] The displaced people were to be resettled in Rajasthan. However, as of February 2014, 9732 requests for land allotment were still pending. Himachal Pradesh threatened Rajasthan that they will file a contempt of court in Supreme Court if land is not allotted.[9] [10]