Antares (rocket) explained

Antares
Function:Medium-lift launch vehicle
Country-Origin:United States
Pcost: until 2012
Cpl:[1]
Diameter:3.9m (12.8feet)
Stages:2 to 3
Capacities:
Kilos:8000kg (18,000lb)
Comparable:Delta II, Atlas III
Sites:MARS, LP-0A
Launches:18 (110: 2, 120: 2, 130: 1, 230: 5, 230+: 8)
Success:17 (110: 2, 120: 2, 130: 0, 230: 5, 230+: 8)
Fail:1 (130: 1)
Payloads:Cygnus
Stagedata:
Stageno:First
Type:stage
Diff:Antares 100
Empty:18700kg (41,200lb)
Gross:260700kg (574,700lb)
Engines:2 × NK-33 (AJ26-62)
Si:


:

Burntime:235 seconds
Stageno:First
Type:stage
Diff:Antares 200
Si:


:

Burntime:215 seconds
Stageno:First
Type:stage
Diff:Antares 300
Stageno:Second
Type:stage
Castor 30A/B/XL
Solid:yes

Antares, known during early development as Taurus II, is an American expendable medium-lift launch vehicle developed and built by Orbital Sciences Corporation (later Orbital ATK and Northrop Grumman) with financial support from NASA under the Commercial Orbital Transportation Services (COTS) program awarded in February 2008, alongside the company's automated cargo spacecraft, Cygnus. Like other launch vehicles developed by Orbital, Antares leveraged lower-cost, off-the-shelf parts and designs.

The first stage is liquid fueled, burning RP-1 (kerosene) and liquid oxygen (LOX). Due to Orbital's limited experience with large liquid stages, the construction was subcontracted to the Ukrainian companies Pivdenne and Pivdenmash. Initially, the Antares 100 series used refurbished NK-33 engines, remnants of the Soviet N1 moon rocket. However, after a catastrophic explosion, the Antares 200 series transitioned to newly built Russian RD-191 engines. Following Russia's invasion of Ukraine, Northrop Grumman announced plans for the Antares 300, featuring a new first stage developed in partnership with Firefly Aerospace. The new first stage, similar to Firefly's MLV launch vehicle, will incorporate composite structures and seven Miranda engines, increasing Antares's payload capacity.

The second stage is a Castor 30-series solid-fuel rocket, derived from the Castor 120 solid motor used in Orbital's Minotaur-C (the original Taurus I), and itself based on a Peacekeeper ICBM first stage. While an optional third stage is offered, it has never been used due to the Cygnus spacecraft's integrated service module.

Antares made its maiden flight on April 21, 2013, launching the Antares A-ONE mission from LP-0A at the Mid-Atlantic Regional Spaceport (MARS) with a Cygnus mass simulator. Later that year, on September 18, the rocket successfully launched Orb-D1, the first Cygnus mission to rendezvous with the International Space Station (ISS). Following the successful completion of these two COTS demonstration missions, Antares and Cygnus have been awarded two Commercial Resupply Services contracts, encompassing a total of 25 missions to the ISS.

The COTS program also funded the development of SpaceX's Dragon spacecraft and Falcon 9 rocket, aiming to stimulate the commercial space industry by creating two medium-lift launch vehicles. While SpaceX's Falcon 9 has achieved significant commercial success, Antares has not. To date, NASA remains Antares's sole customer, and Cygnus its only payload.

History

As the Space Shuttle program neared its end, NASA sought to develop new capabilities for resupplying the International Space Station (ISS). Departing from the traditional model of government-owned and operated spacecraft, the agency proposed a new approach: commercial companies would operate spacecraft, while NASA would act as a customer.

To encourage innovation, NASA offered funding through the Commercial Orbital Transportation Services (COTS) program to support the development of new spacecraft and launch vehicles. On February 19, 2008, NASA announced that it would award Orbital Sciences Corporation a COTS contract worth $171 million. Orbital was expected to invest an additional $150 million, divided between $130 million for the rocket booster and $20 million for the spacecraft.

As part of the COTS program, Orbital would be expected to conduct a successful demonstration of its rocket booster and spacecraft. If both demonstration flights were successful, Orbital would be eligible for a lucrative Commercial Resupply Service contract of $1.9 billion for eight flights to the ISS.[2]

In June 2008, it was announced that the Mid-Atlantic Regional Spaceport, formerly part of the Wallops Flight Facility, in Virginia, would be the primary launch site for the rocket.[3] Launch pad 0A (LP-0A), previously used for the failed Conestoga rocket, would be modified to handle Antares.[4] Wallops allows launches which reach the International Space Station's orbit as effectively as those from Cape Canaveral, Florida, while being less crowded.[5] The first Antares flight launched a Cygnus mass simulator.

On December 10, 2009, Alliant Techsystems Inc. (ATK) test-fired their Castor 30 motor for use on the second stage of the Antares rocket.[6] In March 2010, Orbital Sciences and Aerojet completed test firings of the AJ-26 engines.

Originally designated the Taurus II, Orbital Sciences renamed the vehicle Antares, after the star of the same name,[7] on December 12, 2011.

As of April 2012, development costs were estimated at $472 million.

On February 22, 2013, a hot fire test was successfully performed, the entire first stage being erected on the pad and held down while the engines fired for 29 seconds.

Design

First stage

The first stage of Antares burns RP-1 (kerosene) and liquid oxygen (LOX). As Orbital had little experience with large liquid stages and LOX propellant, the first stage core was designed and is manufactured in Ukraine by Pivdenne Design Office and Pivdenmash and includes propellant tanks, pressurization tanks, valves, sensors, feed lines, tubing, wiring and other associated hardware.[8] Like the Zenit—also manufactured by Pivdenmash—the Antares vehicle has a diameter of 3.9m (12.8feet) with a matching 3.9 m payload fairing.

Antares 100 series

The Antares 100-series first stage was powered by two Aerojet AJ26 engines. These began as Kuznetsov NK-33 engines built in the Soviet Union in the late 1960s and early 1970s, 43 of which were purchased by Aerojet in the 1990s. Twenty of these were refurbished into AJ26 engines for Antares.[9] Modifications included equipping the engines for gimballing, adding US electronics, and qualifying the engines to fire for twice as long as designed and to operate at 108% of their original thrust. Together they produced 3265kN of thrust at sea level and 3630kN in vacuum.

Following the catastrophic failure of an AJ26 during testing at Stennis Space Center in May 2014 and the Orb-3 launch failure in October 2014, likely caused by an engine turbopump,[10] the Antares 100-series was retired.

Antares 200 series

Because of concerns over corrosion, aging, and the limited supply of AJ26 engines, Orbital had selected new first stage engines to bid on a second major long-term contract for cargo resupply of the ISS. After the loss of the Antares rocket in October 2014, Orbital Sciences announced that the Russian RD-181—a modified version of the RD-191—would replace the AJ-26 on the Antares 200-series.[11] [12] The first flight of the Antares 230 configuration using the RD-181 launched on October 17, 2016, carrying the Cygnus OA-5 cargo to the ISS.

The Antares 200 and 200+ first stages are powered by two RD-181 engines, which provide 100000lbf more thrust than the dual AJ26 engines used on the Antares 100. Orbital adapted the existing core stage to accommodate the increased performance in the 200 Series, allowing Antares to deliver up to 6500kg (14,300lb) to low Earth orbit. The surplus performance of the Antares 200-series will allow Orbital to fulfill its ISS resupply contract in only four additional flights, rather than the five that would have been required with the Antares 100-series.[13] [14]

While the 200 series adapted the originally ordered 100 Series stages (KB Pivdenne/Pivdenmash, Zenit derived), it requires under-throttling the RD-181 engines, which reduces performance.

The Antares was upgraded to the Antares 230+ for the NASA Commercial Resupply Services 2 contract. NG-12, launched November 2, 2019, was the first NASA CRS-2 mission to ISS using the 230+ upgrades. The most significant upgrades were structural changes to the intertank bay (between the LOX and RP-1 tanks) and the forward bay (forward of the LOX). Additionally, the company is working on trajectory improvements via a "load-release autopilot" that will provide greater mass to orbit capability.

Antares 300 series

In August 2022, Northrop Grumman announced that it had contracted Firefly Aerospace to build the 300-series first stage, which is similar to Firefly's in-development MLV launch vehicle, and features the same composite structures as well as seven Miranda engines producing of thrust—substantially greater than the previous 200-series first stage. Northrop Grumman states that the new first stage substantially increases the mass capability of Antares.[15]

The announcement occurred as a result of the 2022 Russian invasion of Ukraine, which has jeopardized supply chains for the previous first stages, which are manufactured in Ukraine and use RD-181 engines from Russia.

Second stage

The second stage is an Orbital ATK Castor 30-series solid-fuel rocket, developed as a derivative of the Castor 120 solid motor used as Minotaur-C's first stage, itself based on a LGM-118 Peacekeeper ICBM first stage.[16] The first two flights of Antares used a Castor 30A, which was replaced by the enhanced Castor 30B for subsequent flights. The Castor 30B produces 293.4abbr=on-1abbr=on average and 395.7abbr=on-1abbr=on maximum thrust, and uses electromechanical thrust vector control. For increased performance, the larger Castor 30XL is available and will be used on ISS resupply flights to allow Antares to carry the Enhanced Cygnus.[17]

The Castor 30XL upper stage for Antares 230+ is being optimized for the CRS-2 contract. The initial design of the Castor 30XL was conservatively built, and after gaining flight experience it was determined that the structural component of the motor case could be lightened.

Third stage

Antares offers three optional third stages: the Bi-Propellant Third Stage (BTS), a Star 48-based third stage and an Orion 38 motor. BTS is derived from Orbital's GEOStar, a spacecraft bus and uses nitrogen tetroxide and hydrazine for propellant; it is intended to precisely place payloads into their final orbits. The Star 48-based stage uses a Star 48BV solid rocket motor and would be used for higher energy orbits. The Orion 38 is used on the Minotaur and Pegasus rockets as an upper stage.[18]

Fairing

The 3.9m (12.8feet) diameter, 9.9m (32.5feet) high fairing is manufactured by Northrop Grumman of Iuka, Mississippi, which also builds other composite structures for the vehicle, including the combined fairing adapter, dodecagon, motor cone, and interstage.[19]

NASA Commercial Resupply Services-2 : Enhancements

On January 14, 2016, NASA awarded three cargo contracts via CRS-2. Orbital ATK's Cygnus was one of these contracts.[20]

According to Mark Pieczynski, Orbital ATK Vice President, Flight Systems Group, "A further improved version [of Antares for CRS-2 contract] is in development which will include: Stage 1 core updates including structural reinforcements and optimization to accommodate increased loads. (Also) certain refinements to the RD-181 engines and CASTOR 30XL motor; and Payload accommodations improvements including a 'pop-top' feature incorporated in the fairing to allow late Cygnus cargo load and optimized fairing adapter structure".

Previously, it was understood that these planned upgrades from the Antares 230 series would create a vehicle known as the Antares 300 series. However, when asked specifically about Antares 300 series development, Mr. Pieczynski stated that Orbital ATK has "not determined to call the upgrades, we are working on, a 300 series. This is still TBD".[21]

In May 2018, the Antares program manager Kurt Eberly indicated that the upgrades will be referred to as Antares 230+.

Configurations and numbering

The first two test flights used a Castor 30A second stage. All subsequent flights will use either a Castor 30B or Castor 30XL. The rocket's configuration is indicated by a three-digit number, the first number representing the first stage, the second the type of second stage, and the third the type of third stage. A + sign added as suffix (fourth position) signifies performance upgrades to the Antares 230 variant.

NumberFirst digitSecond digitThird digit
(First stage)(Second stage)(Third stage)
0No third stage
12 × AJ26-62Castor 30ABTS (3 × BT-4)
22 × RD-181Castor 30BStar 48BV
37 × MirandaCastor 30XLOrion 38

Notable missions and anomalies

Antares A-ONE

See main article: Antares A-ONE. Originally scheduled for 2012, the first Antares launch, designated A-ONE was conducted on April 21, 2013,[22] carrying the Cygnus Mass Simulator (a boilerplate Cygnus spacecraft) and four CubeSats contracted by Spaceflight Incorporated: Dove 1 for Cosmogia Incorporated (now Planet Labs) and three PhoneSat satellites—Alexander,[23] Graham and Bell for NASA.[24]

Prior to the launch, a 27-second test firing of the rocket's AJ26 engines was conducted successfully on February 22, 2013, following an attempt on February 13 which was abandoned before ignition.

A-ONE used the Antares 110 configuration, with a Castor 30A second stage and no third stage. The launch took place from Pad 0A of the Mid-Atlantic Regional Spaceport on Wallops Island, Virginia. LP-0A was a former Conestoga launch complex which had only been used once before, in 1995, for the Conestoga's only orbital launch attempt. Antares became the largest—and first—liquid-fuelled rocket to fly from Wallops Island, as well as the largest rocket launched by Orbital Sciences.

The first attempt to launch the rocket, on April 17, 2013, was scrubbed after an umbilical detached from the rocket's second stage, and a second attempt on April 20 was scrubbed due to high altitude winds.[25] At the third attempt on April 21, the rocket lifted off at the beginning of its launch window. The launch window for all three attempts was three hours beginning at 21:00 UTC (17:00 EDT), shortening to two hours at the start of the terminal count, and ten minutes later in the count.[26]

Cygnus CRS Orb-3

See main article: Cygnus Orb-3.

On October 28, 2014, the attempted launch of an Antares carrying a Cygnus cargo spacecraft on the Orb-3 resupply mission failed catastrophically six seconds after liftoff from Mid-Atlantic Regional Spaceport at Wallops Flight Facility, Virginia. An explosion occurred in the thrust section just as the vehicle cleared the tower, and it fell back down onto the launch pad. The range safety officer sent the destruct command just before impact.[27] There were no injuries. Orbital Sciences reported that Launch Pad 0A "escaped significant damage", though initial estimates for repairs were in the $20 million range.[28] Orbital Sciences formed an anomaly investigation board to investigate the cause of the incident. They traced it to a failure of the first stage LOX turbopump, but could not find a specific cause. However, the refurbished NK-33 engines, originally manufactured over 40 years earlier and stored for decades, were suspected as having leaks, corrosion, or manufacturing defects that had not been detected.[29] The NASA Accident Investigation Report was more direct in its failure assessment. On October 6, 2015, almost one year after the accident, Pad 0A was restored to use. Total repair costs were about $15 million.[30]

Following the failure, Orbital sought to purchase launch services for its Cygnus spacecraft in order to satisfy its cargo contract with NASA, and on December 9, 2014, Orbital announced that at least one, and possibly two, Cygnus flights would be launched on Atlas V rockets from Cape Canaveral Air Force Station.[31] As it happened, Cygnus OA-4 and Cygnus OA-6 were launched with an Atlas V and the Antares 230 performed its maiden flight with Cygnus OA-5 in October 2016. One further mission was launched aboard an Atlas in April 2017 (Cygnus OA-7), fulfilling Orbital's contractual obligations towards NASA. It was followed by the Antares 230 in regular service with Cygnus OA-8E in November 2017, with three further missions scheduled on their extended contract.

Launch sequence

The following table shows a typical launch sequence of Antares-100 series rockets, such as for launching a Cygnus spacecraft on a cargo resupply mission to the International Space Station. The coast phase is required because the solid-fuel upper stage has a short burn time.[32]

Mission time Event Altitude
T− 03:50:00 Launch management call to stations
T− 03:05:00 Poll to initiate liquid oxygen loading system chilldown
T− 01:30:00 Poll for readiness to initiate propellant loading
T− 00:15:00 Cygnus/payload switched to internal power
T− 00:12:00 Poll for final countdown and medium flow chilldown
T− 00:11:00 Transporter-Erector-Launcher (TEL) armed for rapid retract
T− 00:05:00 Antares avionics switched to internal power
T− 00:03:00 Auto-sequence start (terminal count)
T− 00:02:00 Pressurize propellant tanks
T− 00:00:00 Main engine ignition
T+ 00:00:02.1 Liftoff 0
T+ 00:03:55 Main engine cut-off (MECO) 102km (63miles)
T+ 00:04:01 Stage one separation 108km (67miles)
T+ 00:05:31 Fairing separation 168km (104miles)
T+ 00:05:36 Interstage separation 170km (110miles)
T+ 00:05:40 Stage two ignition 171km (106miles)
T+ 00:07:57 Stage two burnout 202km (126miles)
T+ 00:09:57 Payload separation 201km (125miles)

See also

Notes and References

  1. Web site: Surplus Missile Motors: Sale Price Drives Potential Effects on DOD and Commercial Launch Providers . U.S. Government Accountability Office. 30. August 2017. GAO-17-609 . https://web.archive.org/web/20230420090146/https://www.gao.gov/assets/gao-17-609.pdf . April 20, 2023 . live.
  2. Web site: SpaceX and Orbital win huge CRS contract from NASA . nasaspaceflight.com. December 23, 2008. February 22, 2015. Chris Bergin.
  3. Governor Kaine announces 125 new jobs for Virginia . Commonwealth of Virginia from YesVirginia.org . Gordon . Hickey . June 9, 2008 . May 11, 2010 . March 25, 2013 . https://web.archive.org/web/20130325161237/http://www.yesvirginia.org/About_Us/NewsArticle.aspx?newsid=945 . dead.
  4. Web site: Taurus-2 Launch Pad to be Ready in 18-Months at Wallops Island Spaceport . Spaceports . Blogspot.com . Jack . Kennedy . June 13, 2008.
  5. News: Wallops up for big role with firm's NASA contract . The Virginian-Pilot from HamptonRoads.com . Jon W. . Glass . February 20, 2008 . April 23, 2008 . February 25, 2021 . https://web.archive.org/web/20210225200226/http://www.tribpub.com/gdpr/pilotonline.com/ . dead.
  6. Second Stage Rocket Motor Of Orbital's Taurus II Launcher Successfully Ground Tested . Orbital Sciences Corporation . Barron . Beneski . December 10, 2009.
  7. Orbital Selects "Antares" as Permanent Name for New Rocket Created by the Taurus II R&D Program . Orbital Sciences Corporation . Barron . Beneski . December 12, 2011.
  8. Web site: Antares User's Guide, Rev. 1.2 . Orbital Sciences Corporation . December 2009.
  9. Web site: Antares First-stage Engines Available Long Term, Aerojet Rocketdyne Chief Says. SpaceNews.com. June 17, 2013.
  10. Web site: SpaceflightNow. Engine turbopump eyed in Antares launch failure. June 12, 2017.
  11. News: Orbital Sciences likely to choose Russian engine for new Antares rocket . TASS . October 31, 2014 . October 31, 2014.
  12. Web site: Orbital Sciences signs contract for new Antares engines . January 22, 2015 . June 27, 2017 . Spaceflight Now.
  13. News: Morring . Frank Jr. . Antares Upgrade Will Use RD-181s In Direct Buy From Energomash . December 28, 2014 . Aviation Week . December 16, 2014 . November 29, 2020 . https://web.archive.org/web/20201129133904/https://yuzhnoye.com.ua/zapushchen-rn-antares . dead.
  14. Web site: Orbital ATK Team on Track for Fall 2015 Cygnus Mission and Antares Return to Flight in 2016 . . August 12, 2015 . August 12, 2015.
  15. Web site: Northrop Grumman Teams with Firefly Aerospace to Develop Antares Rocket Upgrade and New Medium Launch Vehicle . 2022-08-08 . Northrop Grumman Newsroom . en.
  16. Web site: CASTOR 30-A Multi-use Motor. Alliant Techsystems. July 10, 2014 . https://web.archive.org/web/20140714162416/http://www.atk.com/products-services/castor-30-a-multi-use-motor. July 14, 2014.
  17. News: CASTOR 30XL prepares for static fire ahead of providing Antares boost . NASA Spaceflight . Chris . Bergin . March 7, 2013 . March 5, 2013.
  18. Web site: Antares User's Guide. Northrop Grumman. 3.0. August 2018. TM-24022. September 5, 2018. September 6, 2018. https://web.archive.org/web/20180906052537/https://www.northropgrumman.com/Capabilities/Antares/Documents/Antares_UsersGuide.pdf. dead.
  19. Web site: Antares Launch Vehicle . Applied Aerospace Structures Corporation . April 26, 2014 . https://web.archive.org/web/20141024113705/http://www.aascworld.com/Antares/service--1211796061/program.html . October 24, 2014 . dead.
  20. Web site: NASA Awards International Space Station Cargo Transport Contracts. NASA. Cheryl. Warner. Stephanie. Schierholz . January 14, 2016. July 6, 2017.
  21. News: Orbital ATK preps Cygnus flights; Antares enhancements on track for 2019. NASASpaceFlight.com . Chris. Gebhardt. February 3, 2017. July 6, 2017.
  22. News: Antares test launch paves new highway to space station . Spaceflight Now . Stephen . Clark . April 21, 2013 . April 22, 2013.
  23. Web site: PhoneSat v2 . Gunter's Space Page . Gunter . Krebs . April 22, 2013.
  24. Web site: PhoneSat v1 . Gunter's Space Page . Gunter . Krebs . April 22, 2013.
  25. News: Wind postpones rocket launch at Wallops Flight Facility . . Weil . Martin . April 21, 2013.
  26. News: Orbital's Antares rocket makes test flight . BBC News . Jonathan . Amos . April 21, 2013 . April 22, 2013.
  27. News: Rocket bound for space station blows up just after liftoff. Los Angeles Times. James. Queally. W. J.. Hennigan. Lauren. Raab. October 28, 2014. November 8, 2014.
  28. News: Virginia May Seek Federal Funds for Wallops Spaceport Repairs . SpaceNews. Jeff. Foust. November 21, 2014. November 5, 2017.
  29. News: Before explosion, NASA knew aging Soviet engines posed risks. Los Angeles Times. Petersen. Melody. January 3, 2015. https://web.archive.org/web/20150104060651/http://www.latimes.com/business/la-fi-nasa-rocket-failures-20150104-story.html. January 4, 2015. January 27, 2018.
  30. News: Workers complete $15 million in repairs to Antares launch pad . Spaceflight Now. Stephen. Clark. October 6, 2015. November 5, 2017.
  31. News: Private Cargo Spacecraft Gets New Rocket Ride After Accident. Space.com. Miriam. Kramer. December 9, 2014. November 5, 2017. October 8, 2017. https://web.archive.org/web/20171008180833/https://www.space.com/27962-cygnus-cargo-spacecraft-new-rocket.html. dead.
  32. News: Solid rocket stages and how they perform mission-precise orbit insertions. 3 December 2020. 1 August 2023.