Orange Line | |
Other Name: | ORR-West Line |
Type: | Metro |
System: | Namma Metro |
Status: | Planned |
Locale: | Bangalore, Karnataka, India |
Start: | JP Nagar 4th Phase (Vega City Mall) |
End: | Kempapura |
Connectinglines: | Operational (2): Upcoming (3): |
Stations: | 22 (Corridor-I) + 11 (Corridor-II) |
Website: | bmrc.co.in |
Owner: | Bangalore Metro Rail Corporation Limited (BMRCL) |
Character: | TBD |
Depot: | TBD |
Linelength Km: | 42 |
Tracks: | 2 |
Electrification: | 750 V DC third rail |
Map State: | collapsed |
Map Name: | Orange Line Map (TBC) |
The Orange Line or ORR-West Line is an upcoming metro line serving Bangalore as part of the Namma Metro network in the city. This metro line will serve the industrial areas, manufacturing units, educational institutions, providing connectivity to the southern part of the city, thereby improving last-mile connectivity to commercial centres, industrial hubs, educational institutions, and healthcare facilities.[1] [2] The line was approved by the Union Cabinet on August 17th, 2024 and is scheduled for completion in 2029. [3] [4] [5] [6] [7]
The ORR-West Line is planned to have 22 stations.[8]
ORR-West Line (Orange Line) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Station Name | Connections | Station Layout | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
English | Kannada | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
1 | JP Nagar 4th Phase | ಜೆಪಿ ನಗರ ೪ನೇ ಹಂತ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
2 | JP Nagar 5th Phase | ಜೆಪಿ ನಗರ ೫ನೇ ಹಂತ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
3 | Jayaprakash Nagar | ಜಯಪ್ರಕಾಶ ನಗರ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4 | Kadirenahalli Cross | ಕದಿರೇನಹಳ್ಳಿ ಕ್ರಾಸ್ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
5 | Kamakya Bus Depot | ಕಾಮಾಕ್ಯ ಬಸ್ ಘಟಕ | Kamakya Bus Depot | Elevated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
6 | Hosakerahalli Cross | ಹೊಸಕೆರೆಹಳ್ಳಿ ಕ್ರಾಸ್ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
7 | PES Institute of Technology | ಪಿ ಇ ಎಸ್ ತಂತ್ರಜ್ಞಾನ ಸಂಸ್ಥೆ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
8 | Mysuru Road | ಮೈಸೂರು ರಸ್ತೆ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
9 | Nagarabhavi Circle | ನಾಗರಬಾವಿ ವೃತ್ತ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10 | Vinayaka Layout | ವಿನಾಯಕ ಬಡಾವಣೆ | Elevated | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11 | Dr. Ambedkar Institute of Technology | ಡಾ|| ಅಂಬೇಡ್ಕರ್ ತಂತ್ರಜ್ಞಾನ ಸಂಸ್ಥೆ||Elevated|-|12|Nagarbhavi BDA Complex|ನಾಗರಬಾವಿ ಬಿ ಡಿ ಎ ಸಂಕೀರ್ಣ||Elevated|-|13|Sumanahalli Cross|ಸುಮನಹಳ್ಳಿ ಕ್ರಾಸ್| Hoshalli-Kadabagere Line (Grey Line)|Elevated|-|14|Chowdeshwari Nagara|ಚೌಡೇಶ್ವರಿ ನಗರ||Elevated|-|15|Freedom Fighters Cross|ಸ್ವಾತಂತ್ರ್ಯ ಯೋಧರ ನಗರ||Elevated|-|16|Kanteerava Studio|ಕಂಠೀರವ ಸ್ಟುಡಿಯೋ||Elevated|-|17|Peenya|ಪೀಣ್ಯ| |Elevated|-|18|Bahubhali Nagara|ಬಾಹುಬಲಿ ನಗರ||Elevated|-|19|BEL Circle| ಬಿ ಇ ಎಲ್ ವೃತ್ತ||Elevated|-|20|Patelappa Layout|ಪಟೇಲಪ್ಪ ಬಡಾವಣೆ||Elevated|-|21|Hebbala|ಹೆಬ್ಬಾಳ| Hebbala Suburban Railway BMTC Bus Depot |Elevated|-|22|Kempapura|ಕೆಂಪಾಪುರ| |Elevated|}Hosahalli-Kadabagere Line (Grey Line)The proposed line from Hosahalli to Kadabagere is set to have 9 stations. and is yet to be announced.
Integration of the key areas of the cityThese are the notable areas that will be integrated as part of the Phase 3 of Namma Metro and they are as given below:- See alsoReferences] |