Status: | Under construction |
Start: | (through service to) |
Linelength: | 188.30NaN0 (Yunlong to Yiwu) |
Speed: | 1600NaN0 |
The Ningbo–Jinhua railway is a double-track railway currently under construction in China. It is a combined passenger and freight railway. The railway is 188.3km (117miles) long with 9 stations, and has a design speed of 160km/h.[1] The railway is one of the first purpose built electrified railways capable of operating double stack container trains in China.[2]
Construction began on 29 December 2016.[3]
The line has the following stations:[4]