This list of tallest buildings in Christchurch ranks high-rise buildings in Christchurch, New Zealand, by height.
Although New Zealand's second-largest city, Christchurch is predominantly low-rise. The current tallest building is the Pacific Tower, which was completed in 2010 and rises to 86.5m (283.8feet). It is the seventh buildings to have held this title.
Many high-rise buildings were demolished following the February 2011 Christchurch earthquake, making it the single worst event for high rise destruction in history.[1]
Of the 54 buildings standing at least 35m (115feet) before the earthquakes only 18 remain, with the remainder having been demolished.
Background
1900–1979
Manchester Courts, earlier known as the MLC Building, was the city's first commercial high-rise building. Built in 1905–1906 for the New Zealand Express Company, it was at the time the tallest commercial building in Christchurch.[2] A Category I heritage building since 1991, it suffered serious structural damage in the 2010 Canterbury earthquake and was condemned to be demolished. Demolition began on 19 October 2010, and was completed in February 2011.[3]
The BNZ Building in Cathedral Square has one of the oldest histories of the buildings listed here, as it replaced the earlier BNZ Building from 1866. The replacement was begun in 1961 as a four-storey building designed by Christchurch architect G. W. Bucknell. Work ceased abruptly in 1963, when the bank announced that they would redevelop the whole site (which included the removal of the historic bank building) and incorporate the four-storey building into the high-rise. The high-rise was designed by Sydney firm Stephenson and Turner and completed in 1967.[4]
1980–1999
Throughout the 1980s Christchurch saw a high-rise boom, with some of the cities tallest, and most recognisable, buildings constructed during this period. Notable structures include:
Hotel Grand Chancellor, was completed in 1986, and at the time held the title of tallest building. Rising to 85m (279feet), the 26-storey hotel suffered critical structural failure following the 2011 earthquakes and was subsequently demolished shortly after.
Clarendon Tower, designed by Warren and Mahoney, was constructed during 1986/87 on the site of the former Clarendon Hotel. It retained most of the historic hotel's façade, which was the first example of facadism in Christchurch. The 17-storey structure failed in the February 2011 earthquake, with the internal staircases collapsing and the building 'ballooning' in the middle by some .[5]
Forsyth Barr Building (now Crowne Plaza Hotel) is one of only two high-rise structure of those constructed throughout this period which still remain. The 19-storey tower is now the second-tallest building in Christchurch. After suffering staircase collapse in the earthquakes, The building was sold "as is where is" in August 2014 to a local consortium who have since repaired and converted it into a hotel.[6] [7]
Radio Network House, a 14-storey building in Worcester Street was completed in 1986. Following the earthquakes it was imploded on 5 August 2012 and was New Zealand's first ever controlled building demolition by explosives.[8] [9]
Also constructed during this time were the Westpac Canterbury Centre, PricewaterhouseCoopers centre, and Holiday Inn.
2000–2010
The 2000s saw continued high-rise development across the city, with many buildings having been constructed during this time still remaining. Notable structures include:
Pacific Tower, rising 86.5m (283.8feet), is the city's tallest building. Following the earthquakes, it was repaired and reopened on 1 May 2013 and currently houses the Fable Hotel.[10]
HSBC Tower designed by Weirwalker Architecture in Worcester Boulevard, which first opened in 2009. This was the first high-rise to open again after the February 2011 earthquake, with the first tenants moving back in on 30 May 2011.[11] [12] The Canterbury Earthquake Recovery Authority later moved into the top floors of the building, with CEO Roger Sutton's office the "highest office in town".[13]
Novotel Hotel at Cathedral Square was completed in 2010. Rising 15-storeys, it was repaired following the earthquakes and reopened on 19 August 2013.[14] [15]
Also constructed during this time were the Gallery Apartments, Victoria Square Tower, and Oxford Apartments.
2011–present
High-rise construction following the 2010/2011 earthquakes has largely been blocked due to height-limits imposed by the Christchurch City Council. Buildings were restricted to 28m (92feet), unless a structure which exceeded this height had previously stood on the site.
In the decade following 2011, only two buildings standing above 35m (115feet) have been constructed, with a further three currently under construction.
In September 2024, Council voted to remove height restrictions within certain areas of the CBD, and loosened requirements surrounding the need for developers to apply for resource consent. This was in response to the central governments push for the development of intensive housing.
As of September 2024, there are currently two active proposals to develop buildings standing taller than 35m (115feet) and numerous more which, while inactive, have yet to be officially cancelled.
Lists
Tallest buildings
This lists ranks Christchurch high-rises that stand at least 35m (115feet) tall, based on standard height measurement. This includes spires, architectural details, and antenna masts.
Colour key
Rank | Name | Height
| Floors | Year | Purpose | Architect | Builder | Notes | | Refs |
---|
1 | Pacific Tower, 166 Gloucester St | 86.5m (283.8feet) | 23 | 2010 | Hotel & Apartments | Rob Campbell | AMC Construction | Reopened 1 May 2013 | [16] [17] |
2 | Crowne Plaza Hotel (former Forsyth Barr Building), 764 Colombo St | 74m (243feet) | 19 | 1989 | Hotel | Warren and Mahoney | Paynter Construction | Reopened 1 July 2017 as Crowne Plaza Hotel | [18] [19] [20] [21] |
3 | Distinction Hotel (formerly the Millennium Christchurch), 14 Cathedral Sq | 55.5m (182.1feet) | 14 | 1974 | Hotel | Hank Henning | Fletcher Construction | Reopened 6 March 2018 | [22] [23] |
4 | Rydges Hotel (former Noah's), 170 Oxford Tce | 54m (177feet) | 15 | 1975 | Hotel | Donald Crone & Associates | Fletcher Construction | Undergoing repairs. | [24] [25] [26] [27] [28] [29] |
5 | Novotel Hotel, 50 Cathedral Sq | 53.5m (175.5feet) | 15 | 2010 | Hotel | Dalman Architecture | Fletcher Construction | Reopened 19 August 2013 | [30] [31] |
6 | Puaka–James Hight Building, University of Canterbury, 20 Kirkwood Ave | 53m (174feet) | 11 | 1974 | Library & Office | Ministry of Works | CS Luney Construction | Reopened 2013 | [32] [33] [34] |
7= | Waipapa Tower 1 & 2, Christchurch Hospital, 2 Riccarton Ave | 50m (160feet) | 10 | 2018 | Hospital | Chow:Hill, Warren and Mahoney, Thinc Health | Schick Construction for earthworks and CPD Construction for tower | Tallest building completed since the earthquakes | [35] [36] |
7= | Waipapa Tower 3, Christchurch Hospital, 2 Riccarton Ave | 50m (160feet) | 10 | 2025 | Hospital | Chow:Hill, Warren and Mahoney, Thinc Health | Naylor Love | Scheduled for completion third quarter 2025 | [37] [38] |
9 | One New Zealand Stadium, 218 Madras St | 48m (157feet) | n/a | 2026 | Stadium | Warren and Mahoney | BESIX Watpac | Scheduled for completion April 2026 | [39] |
10 | Christchurch Civic Offices (former Post Centre), 53 Hereford St | 47.5m (155.8feet) | 8 | 1981 | Office | Athfield Architects | Hawkins Construction | Reopened October 2011 | [40] [41] [42] |
11 | Anthony Harper Tower (Former HSBC Club Tower), 62 Worcester Blvd | 45.5m (149.3feet) | 12 | 2010 | Office | Weirwalker Architecture | Hawkins Construction | Reopened 30 May 2011 | [43] |
12= | University of Otago, Christchurch Medical School, 2 Riccarton Ave | 45m (148feet) | 12 | 1973 | School | Ministry of Works | Fletcher Construction | Reopened 2013 | [44] |
12= | Telecom Building, 31 Cathedral Sq | 45m (148feet) | 12 | 1992 | Office | Griffith Moffat and Partners | Hawkins Construction | Partially reopened | [45] |
12= | Oxford Apartments, 66 Oxford Tce | 45m (148feet) | 12 | 2005 | Residential | Warren and Mahoney | C. S. Luney Ltd | Repaired | [46] [47] |
15 | Huadu Innovation Hub (Former IRD Building) | 42.5m (139.4feet) | 8 | 2007 | Office | Sumich Architects | C Lund and Son Construction | Repaired | [48] [49] |
16 | Christchurch Women's Hospital | 42m (138feet) | 9 | 2005 | Hospital | Chow Hill Architects Ltd | Hawkins Construction | Reopened | [50] [51] |
17= | Otago University Building, 20 Oxford Tce | 40 (130) | 6 | 2026 | University | Warren and Mahoney | Leighs Construction | Under Construction | [52] [53] |
17= | West Building, University of Canterbury, 20 Kirkwood Avenue | 40m (130feet) | 8 | 1965 | University | Ministry of Works | Williamson Construction. | Open | [54] [55] |
17= | 161 Hereford Suites (former Harmony Towers), 161 Hereford St | 40m (130feet) | 10 | 1988 | Hotel | Gabites Porter & Partners | Highcroft Properties | To be repaired | [56] |
20 | Grand Central Building, 161 Cashel Street | 38.5m (126.3feet) | 8 | 2016 | Office | Warren and Mahoney | Fletcher Construction | Opened 2016 | [57] |
21 | Huadu International Building (former Law Courts), 282 Durham St North | 36.5m (119.8feet) | 7 | 1987 | Office | Ministry of Works | Ministry of Works | Open | |
22= | State Insurance Building, 116 Worcester St | 36m (118feet) | 10 | 1970 | Office | Collins & Son | W. Williamson & Sons | To be repaired | [58] [59] |
22= | The Gloucester, 28 Gloucester St | 36m (118feet) | 10 | 1991 | Residential | Wilkie & Bruce | C. S. Luney Ltd | Open | [60] |
24 | Christchurch Hospital, Riverside Block | 35.5m (116.5feet) | 8 | 1974 | Hospital | Ministry of Works | Fletcher Construction | Reopened | [61] |
25 | BreakFree on Cashel, 165 Cashel St | 35m (115feet) | 7 | 1980 | Hotel | Ministry of Works | Ministry of Works | Reopened 2016 | | |
Proposed buildings
This lists ranks Christchurch high-rises are/were proposed to stand at least 35m (115feet) tall, based on standard height measurement. This includes spires, architectural details, and antenna masts.
Colour key
Name | Heightm (feet) | Floors | Year | Purpose | Architect | Notes | Refs |
---|
Garden City Tower, 101 Victoria Square | | 13 | 2008 | Office/Apartments | | Cancelled shortly after its proposal. A three storey carpark was constructed however damaged and demolished after the earthquakes | |
The Pinnacle, 79 Lichfield St | 80m (260feet) | 26 | 2009 | Apartments | | Would have been the tallest building in the city at the time if completed. Cancelled 2010 | |
West Kilmore Aprtments, 52 Kilmore St | | 11 | 2015 | Apartments | | Scaled back to a 9 floor tower before being cancelled in 2017 | |
Verve Precinct, 52 Peterborough St | | 11 | 2016 | Apartments | | On the former Est@blishment site. Cancelled in 2017 due to lack of sales | |
Cathedral Towers, 26 Cathedral Sq | | 15/12 | 2016 | Apartments | Sheppard & Rout | Two towers. Cancelled in 2017 | |
Holiday Inn Express, 160 Gloucester St | | 14 | 2016 | Hotel | | $30 million development | [62] |
The Peterborough, 359 Durham St North | | 10 | 2018 | Hotel | | $85 million development | [63] |
Clarendon Tower, 78 Worcester St | | 16 | 2019 | Hotel & Office | | A replacement for the demolished Clarendon Tower | [64] |
47 Cathedral Sq | | 12 | 2019 | Office | | Replacement for the Grant Thornton Building | |
173 Cashel St | 44m (144feet) | 13 | 2022 | Hotel | | Likely to be a 4-to-5 star hotel | [65] [66] |
137 Cambridge Tce | 42m (138feet) | 11 | 2024 | Hotel | | Replacement for the Harley Chambers | |
52 Peterborough St | | 11 | 2024 | Hotel | | On the former Est@blishment site | [67] |
Waipapa Tower 3, Christchurch Hospital, 2 Riccarton Ave | 58.8m (192.9feet) | 10 | 2025 | Hospital | Chow:Hill, Warren and Mahoney, Thinc Health | Scheduled for completion third quarter 2025 | |
One New Zealand Stadium (Te Kaha), 218 Madras St | 48m (157feet) | n/a | 2026 | Stadium | Warren and Mahoney | Under construction with completion set for early 2026 | [68] |
Otago University Building, 20 Oxford Tce | 40m (130feet) | 6 | 2026 | Medical School | Warren and Mahoney | Scheduled form completion 2026 | [69] | |
Tallest buildings prior to the February 2011 earthquake
This lists ranks Christchurch high-rises that stand/stood at least 35m (115feet) tall, based on standard height measurement. This includes spires, architectural details, and antenna masts.
Colour key
Rank | Name | Height
| Floors | Year | Purpose | Architect | Builder | Notes | | Refs |
---|
1 | Pacific Tower, 166 Gloucester St | 86.5m (283.8feet) | 23 | 2010 | Hotel & residential | Rob Campbell | AMC Construction | Reopened 1 May 2013 | |
2 | Hotel Grand Chancellor, 161 Cashel St | 85m (279feet) | 20 | 1986 | Hotel | Warren and Mahoney | Forbes Construction | Demolished 2012 | [70] |
3 | PricewaterhouseCoopers, 118 Armagh St | 79m (259feet) | 21 | 1990 | Office | Wilkie & Bruce | Wilkins & Davies Construction | Demolished 2012 | [71] |
4 | Forsyth Barr Building, 764 Colombo St | 71m (233feet) | 19 | 1989 | Office | Warren and Mahoney | Paynter Construction | Reopened 1 July 2017 as Crowne Plaza Hotel | |
5 | Clarendon Tower, 78 Worcester St | 67.7m (222.1feet) | 18 | 1988 | Office | Warren and Mahoney | Paynter Construction | Demolished 2012 | |
6 | Radio Network House, 155 Worcester St | 61m (200feet) | 14 | 1986 | Office | Sheppard & Rout | Forbes Construction | Imploded on 5 August 2012 | |
7 | Rydges Hotel (former Noah's), 170 Oxford Tce | 60m (200feet) | 15 | 1975 | Hotel | Donald Crone & Associates | Fletcher Construction | To be repaired | [72] |
8 | Holiday Inn (former Centra), Cnr High and Cashel Sts | 60m (200feet) | 15 | 1988 | Hotel | Peter Beaven | C. S. Luney Ltd | Demolished 2012 | [73] [74] |
9 | Westpac Canterbury Centre, cnr High and Cashel Sts | 55.1m (180.8feet) | 14 | 1983 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [75] |
10 | James Hight Building, University of Canterbury, 20 Kirkwood Ave | 53m (174feet) | 11 | 1974 | Library | Ministry of Works | C. S. Luney Ltd | Reopened 2013 | |
11 | Christchurch Central Police Station, 48 Hereford St | 52m (171feet) | 14 | 1973 | Office | Ministry of Works architects | W. Williamsom & Sons | Imploded on 31 May 2015[76] | [77] [78] [79] |
12 | Victoria Square Tower (The Rutherford), 100 Armagh St | 51.8m (169.9feet) | 15 | 2006 | Residential | Buchan Group | Hawkins Construction | Demolished 2014 | [80] [81] |
13 | Novotel Hotel, 50 Cathedral Sq | 51.6m (169.3feet) | 15 | 2010 | Hotel | Dalman Architecture | Fletcher Construction | Reopened 19 August 2013 | |
14 | Heritage Hotel, 28–30 Cathedral Sq | 51.6m (169.3feet) | 12 | 1971 | Hotel | | Forbes Construction | Demolished 2013 | [82] [83] |
15 | Millennium Christchurch, 14 Cathedral Sq | 51.2m (168feet) | 14 | 1974 | Hotel | Hank Henning | Fletcher Construction | Reopened 6 March 2018 as Distinction Hotel[84] | [85] [86] |
16 | BNZ Building, 129 Hereford St | 51m (167feet) | 12 | 1967 | Office | Stephenson & Turner | P.D. Graham & Co. | Demolished 2017 | [87] |
17 | University of Otago, Christchurch Medical School, 2 Riccarton Ave | 50m (160feet) | 12 | 1973 | School | Ministry of Works | Fletcher Construction | Reopened 2013 | |
18 | HSBC Building (Club Tower), 62 Worcester Blvd | 45.2m (148.3feet) | 12 | 2010 | Office | Weirwalker Architecture | Hawkins Construction | Reopened 30 May 2011 | |
19 | Crowne Plaza, cnr Kilmore and Durham Sts | 45m (148feet) | 12 | 1988 | Hotel | Warren and Mahoney | Fletcher Construction | Demolished 2012 | [88] |
20 | Christchurch Civic Offices (former Postal Centre), 53 Hereford St | 45m (148feet) | 8 | 1981 | Office | Athfield Architects | Hawkins Construction | Reopened October 2011 | |
21 | Gallery Apartments, 62 Gloucester St | 43.6m (143feet) | 12 | 2007 | Residential | Wilson & Hill | Hawkins Construction | Demolished 2012 | [89] [90] |
22 | Anthony Harper House (former AMP Building), 47 Cathedral Sq | 43.1m (141.4feet) | 12 | 1975 | Office | Donald Crone & Associates | C. S. Luney Ltd | Demolished 2012 | [91] |
23 | Telecom Building, 31 Cathedral Sq | 42.4m (139.1feet) | 12 | 1992 | Office | Griffith Moffat and Partners | Hawkins Construction | Partially reopened | |
24 | Oxford Apartments, 66 Oxford Tce | 42.4m (139.1feet) | 12 | 2005 | Residential | Warren and Mahoney | C. S. Luney Ltd | Repaired | [92] |
25 | NZI House, 92 Hereford St | 40.9m (134.2feet) | 12 | 1986 | Office | Wilson & Hill | Paynter & Hamilton Ltd | Demolished 2012 | [93] |
26 | Tower Insurance (former Government Life Building), 69 Cathedral Sq | 40.8m (133.9feet) | 10 | 1963 | Office | Collins & Son | C. S. Luney Ltd | Demolished 2014 | [94] |
27 | BNZ Building, 137 Armagh St | 40.6m (133.2feet) | 11 | 1985 | Office | Trengrove and Blunt | C. S. Luney Ltd | Demolished 2013 | [95] [96] |
28 | Avalon Apartments, 41 Cambridge Terrace | 40m (130feet) | 13 | 2003 | Residential | | Naylor Love | Demolished | [97] |
29 | Oaks iStay Hotel, 187 Cashel St | 40m (130feet) | 12 | 2006 | Hotel | Warren and Mahoney | Naylor Love Construction | Demolished 2015 | [98] [99] |
30 | Bridgewater Apartments, 62 Cashel St | 40m (130feet) | 12 | 1997 | Residential | Warren and Mahoney | Mainzeal Construction | Demolished | [100] |
31 | West Building, University of Canterbury, 20 Kirkwood Avenue | 40m (130feet) | 8 | 1965 | University | Ministry of Works | Williamson Construction. | Open | |
32 | Manchester Courts, 158–160 Manchester Street | 39.6m (129.9feet) | 12 | 1906 | Office | Luttrell Brothers | | Demolished 2010/11 | |
33 | Te Waipounamu House (former Reserve Bank Building), 158 Hereford St | 39.6m (129.9feet) | 10 | 1964 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2013 | [101] |
34 | Farmers Car Park Building, 194 Oxford Terrace | 39.1m (128.3feet) | 10 | 1998 | Retail & car parking | Ian Krause | Lund Construction | Demolished 2013 | [102] |
35 | Craigs Investments (former Langwood House), 90 Armagh St | 38.9m (127.6feet) | 10 | 1987 | Office | Sheppard & Rout | Lund Construction | Demolished 2013 | [103] [104] |
36 | Christchurch Women's Hospital | 38m (125feet) | 9 | 2005 | Hospital | Ministry of Works | Hawkins Construction | Reopened | |
37 | Huadu Innovation Hub (Former IRD Building) | 37m (121feet) | 8 | 2007 | Office | Sumich Architects | C Lund and Son Construction | Repaired | |
38 | Westminster House, 202 Cashel St | 35.8m (117.5feet) | 10 | 1978 | Office | Warren and Mahoney | Williams Construction | Demolished 2012 | [105] |
39 | State Insurance Building, 116 Worcester St | 35.6m (116.8feet) | 10 | 1970 | Office | Collins & Son | W. Williamson & Sons | To be repaired | |
40 | Christchurch Hospital, Riverside Block | 35.5m (116.5feet) | 8 | 1973 | Hospital | Ministry of Works | Fletcher Construction | Reopened | |
41 | 161 Hereford Suites (former Harmony Towers), 161 Hereford St | 35.2m (115.5feet) | 10 | 1988 | Hotel | Gabites Porter & Partners | Highcroft Properties | To be repaired | |
42 | Copthorne Hotel, 335 Durham St | 35m (115feet) | 11 | 1986 | Hotel | | Williams Construction | Demolished 2011 | [106] |
43 | SBS House (former Manchester Unity Building), 180 Manchester St | 35m (115feet) | 10 | 1967 | Office | Peter Beaven | Fletcher Construction | Demolished 2011 | [107] |
44 | Brannigans Building (former DFC Building), 86 Gloucester St | 35m (115feet) | 10 | 1987 | Office | Warren and Mahoney | Forbes Construction | Demolished 2012 | [108] [109] |
45 | Copthorne Hotel (former Ramada Inn), 776 Colombo St | 35m (115feet) | 10 | 1972 | Hotel | Peter Beaven | Fletcher Construction | Demolished 2013 | [110] [111] [112] [113] |
46 | The Gloucester, 28 Gloucester St | 35m (115feet) | 10 | 1991 | Residential | Wilkie & Bruce | C. S. Luney Ltd | Open | |
47 | National Bank, 164 Hereford St | 35m (115feet) | 10 | 1980 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [114] |
48 | National Insurance Building, 217 Gloucester St | 35m (115feet) | 10 | 1971 | Office | Warren and Mahoney | Wilkins and Davies Construction | Demolished 2012 | |
49 | AMI Insurance, 29–35 Latimer Sq | 35m (115feet) | 10 | 1972 | Office | Warren and Mahoney | C. S. Luney Ltd | Demolished 2012 | [115] |
50 | Heatherlea Apartment, 10 Ayr St | 35m (115feet) | 12 | 1987 | Residential | Wilkie & Bruce | Wilkins & Davies Construction | Demolished 2012 | [116] |
51 | Westpark Tower, 56 Cashel St | 35m (115feet) | 10 | 1987 | Office | Sheppard & Rout | Hanham & Phillip | Demolished 2012 | [117] |
52 | Terrace on the Park Apartments, 80 Park Terrace | 35m (115feet) | 10 | 2000 | Residential | Thom Craig | Mainzeal Construction | Demolished 2012 | [118] |
53 | The Millbrook Apartments, 21–23 Carlton Mill Rd | 35m (115feet) | 10 | 1965 | Residential | Don Donnithorne | C.S. Luney Ltd | Demolished 2012 | [119] |
54 | The Establishment, 52 Peterborough St | 35m (115feet) | 11 | 2004 | Residential | Warren and Mahoney | C.S. Luney Ltd | Demolished 2012 | [120] | |
Timeline of tallest buildings
This is a list of the history of the tallest buildings in Christchurch, showing those buildings that once held the title of tallest building in chronological order.
See also
Notes and References
- Web site: Emporis- Christchurch. https://web.archive.org/web/20160403073337/http://www.emporis.com/city/101239/christchurch-new-zealand. usurped. 3 April 2016.
- Web site: Manchester Courts . . 25 January 2013 . PDF . 12 February 2018 . https://web.archive.org/web/20180212045153/https://quakestudies.canterbury.ac.nz/store/object/297?id=16996&view=media . live .
- News: Manchester Courts demolition begins . https://archive.today/20101021071533/http://www.stuff.co.nz/the-press/news/canterbury-earthquake/4247978/Manchester-Courts-demolition-begins . dead . 21 October 2010 . Glenn . Conway . . 19 October 2010 . 19 October 2010 .
- Book: Round the Square : A History of Christchurch's Cathedral Square . 1995 . Clerestory Press . Christchurch . 0-473-03399-2 . NZ Federation of University Women . 50–52.
- News: Greenhill . Marc . 13 March 2012 . Clarendon Tower 'a horror story' . live . https://web.archive.org/web/20120826080556/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/6567773/Clarendon-Tower-a-horror-story . 26 August 2012 . 21 January 2013 . The Press.
- News: Taylor . Colin . 1 October 2014 . Hotel sector springs back to life . live . https://web.archive.org/web/20141002073249/http://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=11334326 . 2 October 2014 . 20 October 2014 . The New Zealand Herald.
- News: McDonald . Liz . 7 August 2014 . Forsyth Barr to become a hotel . live . https://web.archive.org/web/20141020184915/http://www.stuff.co.nz/the-press/business/the-rebuild/10358115/Forsyth-Barr-to-become-a-hotel . 20 October 2014 . 20 October 2014 . The Press.
- News: Post . Nadine M. . 6 August 2012 . Quake-Damaged Building Implosion One for the Books . live . https://web.archive.org/web/20130122065736/http://enr.construction.com/buildings/building_types/2012/quake-damaged-implosion-could-be-a-textbook-case.asp . 22 January 2013 . 22 January 2013 . Engineering News-Record.
- News: 5 August 2012 . Radio Network House imploded . dead . https://web.archive.org/web/20121024005444/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/7415790/Implosion-demolishes-Radio-Network-House . 24 October 2012 . 22 January 2013 . The Press.
- News: Stylianou . Georgina . 1 May 2013 . Rendezvous Hotel reopens today . live . https://web.archive.org/web/20130502214149/http://www.stuff.co.nz/the-press/business/8616461/Rendezvous-Hotel-reopens-today . 2 May 2013 . 1 May 2013 . The Press.
- News: Mathewson . Nicole . 20 July 2011 . HSBC tenants move back in . live . https://web.archive.org/web/20141014105223/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/5315693/HSBC-tenants-move-back-in . 14 October 2014 . 10 February 2013 . The Press.
- Web site: Fussell . Alistair . Rebuilding Christchurch: The Role of the Steel Construction Industry . live . https://web.archive.org/web/20130209183751/http://www.hera.org.nz/Story?Action=View&Story_id=1456 . 9 February 2013 . 10 February 2013 . Heavy Engineering Research Association.
- News: Wright . Michael . 13 June 2012 . Sutton plays long game one year on . live . https://web.archive.org/web/20160203132256/http://www.stuff.co.nz/the-press/news/7092128/Sutton-plays-long-game-one-year-on . 3 February 2016 . 10 February 2013 . The Press.
- News: Wood . Alan . 29 July 2013 . Novotel almost ready to reopen doors . live . https://web.archive.org/web/20140504000847/http://www.stuff.co.nz/the-press/business/the-rebuild/8974633/Novotel-almost-ready-to-reopen-doors . 4 May 2014 . 4 May 2014 . . Fairfax NZ News.
- News: 22 August 2013 . Novotel Christchurch celebrates reopening . live . https://web.archive.org/web/20140504021423/http://www.scoop.co.nz/stories/AK1308/S00688/novotel-christchurch-celebrates-reopening.htm . 4 May 2014 . 4 May 2014 . Scoop.
- News: Berry . Michael . Pacific Tower to reopen by February . 21 January 2013 . . 19 July 2012 . 22 August 2012 . https://web.archive.org/web/20120822083711/http://www.stuff.co.nz/the-press/business/7306017/Pacific-Tower-to-reopen-by-February . live .
- Web site: Christchurch Before and After earthquake visualization Digital New Zealand. 20 February 2021. cccbeforeafter.digitalnewzealand.info. 20 April 2021. https://web.archive.org/web/20210420205526/http://cccbeforeafter.digitalnewzealand.info/. dead.
- News: 27 September 2012 . Research into city's high rise quake evacuees . live . https://web.archive.org/web/20130219101726/http://www.christchurchstar.co.nz/news/research-citys-high-rise-quake-evacuees/1560553/ . 19 February 2013 . 22 January 2013 . The Star . Christchurch.
- Web site: Forsyth Barr building to become Crowne Plaza Hotel . Stuff.co.nz . 3 December 2014 . 18 December 2015 . 3 December 2014 . https://web.archive.org/web/20141203032940/http://www.stuff.co.nz/the-press/63784993/Forsyth-Barr-building-to-become-Crowne-Plaza-Hotel . live .
- Web site: New Christchurch Crowne Plaza launching with conference spaces. Stuff. 11 April 2017. 14 June 2017. 20 July 2017. https://web.archive.org/web/20170720210301/http://www.stuff.co.nz/business/91438463/New-Christchurch-Crowne-Plaza-launching-with-conference-spaces. live.
- Web site: LINZ Data Service . 1 September 2024 . data.linz.govt.nz.
- News: McDonald. Liz. New Distinction Hotel opens in former central Christchurch Millennium building. 9 March 2018. stuff.co.nz. 9 March 2018. https://web.archive.org/web/20180309202759/https://www.stuff.co.nz/business/102109862/new-distinction-hotel-opens-in-former-central-christchurch-millennium-building. live.
- Web site: LINZ Data Service . 1 September 2024 . data.linz.govt.nz.
- News: Wood . Alan . Christchurch hotels plan relaunch . 23 January 2013 . . 11 July 2011 . 13 April 2014 . https://web.archive.org/web/20140413141926/http://www.stuff.co.nz/business/rebuilding-christchurch/5264152/Christchurch-hotels-plan-relaunch . live .
- News: Owner of central Christchurch buildings commits to city as High Court proceedings settle. 13 July 2016. . Stuff.co.nz. 13 July 2016.
- News: Earthquake-hit ex-Rydges hotel building clears Supreme Court insurance battle . 30 April 2019 . . 30 April 2019 . 30 April 2019 . https://web.archive.org/web/20190430032331/https://www.stuff.co.nz/business/112319617/repair-of-christchurch-hotel-and-rebuild-of-office-tower-can-go-ahead-after-insurance-ruling . live .
- News: news City hotel on track to reopen after insurance deal made nearly 12 years . 14 December 2022 . . 13 December 2022 . https://web.archive.org/web/20221213203136/https://www.stuff.co.nz/the-press/news/130733375/city-hotel-on-track-to-reopen-after-insurance-deal-made-nearly-12-years-postquake . live .
- Web site: LINZ Data Service . 1 September 2024 . data.linz.govt.nz.
- News: $100m makeover: Hotel to the stars back from the dead . 7 October 2024 . www.stuff.co.nz . Stuff.
- News: Walton . John . Novotel & Ibis Christchurch hotels to reopen within the year . 23 January 2013 . Australian Business Traveller . 18 May 2012 . 2 March 2013 . https://web.archive.org/web/20130302062104/http://www.ausbt.com.au/novotel-ibis-christchurch-hotels-to-reopen-within-the-year . live .
- Web site: Christchurch City Hotels Dash To Cater For Demand | Stuff.co.nz. 2 May 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413124803/http://www.stuff.co.nz/the-press/business/8626901/City-hotels-dash-to-cater-for-demand. live.
- Web site: Central Library – Te Puna Mātauraka o Waitaha . University of Canterbury. 4 June 2012.
- Web site: Central Library Floor Plans . University of Canterbury . 4 June 2012 . 5 May 2013 . https://web.archive.org/web/20130505061549/http://library.canterbury.ac.nz/central/floorplans.shtml . live .
- Web site: James Hight Library . University of Canterbury . 31 May 2021 . 6 May 2021 . https://web.archive.org/web/20210506152609/https://www.canterbury.ac.nz/irm/ce_james_hight_library.shtml . dead .
- News: Massive concrete pours start this weekend at the Acute Services building, Christchurch Hospital. 3 August 2015. 24 July 2015. 3 February 2016. https://web.archive.org/web/20160203132256/http://www.cdhb.health.nz/News/Media-Releases/Pages/Massive-concrete-pours-start-this-weekend-at-the-Acute-Services-building,-Christchurch-Hospital.aspx. live.
- Web site: LINZ Data Service . 1 September 2024 . data.linz.govt.nz.
- Web site: Architects (www.nzia.co.nz) . NZ Institute of . Waipapa Christchurch Hospital (formerly known as Acute Services Building) . 31 August 2024 . NZ Institute of Architects (www.nzia.co.nz).
- Web site: Bharbhari . Ruchita . 14 April 2023 . Construction begins on third tower for the Waipapa Building at Christchurch Hospital . 31 August 2024 . Te Whatu Ora ‐ Waitaha Canterbury . en-NZ.
- Web site: 16 January 2024 . Te Kaha construction reaches new heights . 31 August 2024 . Newsline . en-GB.
- Web site: Council's new Civic Building – Projects to improve Christchurch – Christchurch City Council . Ccc.govt.nz . 14 February 2013 . 18 March 2015 . https://web.archive.org/web/20150318135717/http://ccc.govt.nz/cityleisure/projectstoimprovechristchurch/newcivicbuilding/index.aspx . live .
- News: Reopening after no structural issues found. Greenhill. Marc. 11 January 2012. Stuff.co.nz. en. 29 August 2016. 10 April 2012. https://web.archive.org/web/20120410131316/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/6238000/Reopening-after-no-structural-issues-found. live.
- Web site: Emporis- Christchurch Civic Offices. https://web.archive.org/web/20210518022912/https://www.emporis.com/buildings/1516399/christchurch-civic-offices-christchurch-new-zealand. usurped. 18 May 2021.
- Web site: Emporis-HSBC Tower. https://web.archive.org/web/20210518022915/https://www.emporis.com/buildings/296433/club-tower-christchurch-new-zealand. usurped. 18 May 2021.
- Web site: Building Status at 17 January 2013 . University of Otago, Christchurch . 21 January 2013 . 1 . 13 April 2014 . https://web.archive.org/web/20140413131249/http://www.otago.ac.nz/emergency/otago017630.pdf . live .
- News: Telecom staff won't be forced to work in CBD . Stuff.co.nz . 14 February 2013 . 13 April 2014 . https://web.archive.org/web/20140413142014/http://www.stuff.co.nz/business/rebuilding-christchurch/5384954/Telecom-staff-won-t-be-forced-to-work-in-CBD . live .
- Web site: Oxford Apartments . . 4 June 2012 . 10 March 2011 . https://web.archive.org/web/20110310041818/http://www.warrenandmahoney.com/en/portfolio/oxford-apartments/ . live .
- News: Owners take insurance and offer 'as is where is' high rise apartments to market . 24 July 2018 . . 24 July 2018 . https://web.archive.org/web/20180724062930/https://www.stuff.co.nz/business/105160756/owners-take-insurance-and-offer-as-is-where-is-high-rise-apartments-to-market . live .
- Web site: Emporis- 232 Cashel Street Tower. https://web.archive.org/web/20210518022915/https://www.emporis.com/buildings/1524349/232-cashel-street-tower-christchurch-new-zealand. usurped. 18 May 2021.
- Web site: IRD Building – Christchurch | Thermosash Building Envelope Solutions.
- Web site: Christchurch Women's Hospital Hawkins. 6 April 2021. hawkins.co.nz. 2 February 2022. https://web.archive.org/web/20220202143911/https://hawkins.co.nz/projects/christchurch-womens-hospital/. live.
- Web site: Emporis, Christchurch Womens Hospital.
- Web site: McDonald . Liz . Go-ahead for University of Otago's $178m Christchurch building . Stuff . Stuff . 11 June 2024.
- News: Go-ahead for University of Otago's $178m Christchurch building . 11 June 2024 . www.stuff.co.nz.
- Web site: West Building, University of Canterbury . . https://web.archive.org/web/20210524234535/https://www.emporis.com/buildings/1584799/west-building-universty-of-canterbury-christchurch-new-zealand . usurped . 24 May 2021 . 26 May 2021.
- Web site: Science buildings history . University of Canterbury . 28 May 2021 . 3 June 2021 . https://web.archive.org/web/20210603184807/https://www.canterbury.ac.nz/irm/ce_Science.shtml . live .
- News: Meier. Cecile. Christchurch CBD's derelict buildings to come back to life. 11 August 2015. Stuff. 10 August 2015. 24 September 2015. https://web.archive.org/web/20150924171324/http://www.stuff.co.nz/the-press/business/the-rebuild/70846418/christchurch-cbds-derelict-buildings-to-come-back-to-life. live.
- Web site: Grand Central Building Thermosash Building Envelope Solutions . 1 September 2024 . www.thermosash.co.nz.
- Web site: Cathedral Sq 'just too raw'. Stuff. 25 September 2015. 29 August 2016. 19 October 2016. https://web.archive.org/web/20161019045729/http://www.stuff.co.nz/business/72246633/slow-progress-on-abandoned-buildings-at-the-heart-of-christchurch. live.
- News: 14 December 2018. Brittens sell quake-damaged Christchurch heritage building. 22 December 2020. Stuff. en. 6 February 2021. https://web.archive.org/web/20210206005347/https://www.stuff.co.nz/business/109357340/brittens-sell-quakedamaged-christchurch-heritage-building. live.
- Web site: 28 GLOUCESTER STREET, CHRISTCHURCH CENTRAL 8013 | Canterbury Earthquake Recovery Authority . Cera.govt.nz . 14 February 2013 . 3 February 2016 . https://web.archive.org/web/20160203132256/http://cera.govt.nz/my-property?address=28+GLOUCESTER+STREET%2C+CHRISTCHURCH+CENTRAL&address_id=22019876 . live .
- Web site: Emporis, Christchurch Hospital Riverside Block.
- News: 14-storey $30 million hotel a post-earthquake first for Christchurch . live . https://web.archive.org/web/20181227085445/https://www.stuff.co.nz/the-press/business/the-rebuild/82483253/14storey-hotel-a-postearthquake-first-for-christchurch . 27 December 2018 . 27 July 2016.
- News: Christchurch Casino to build $85m, 200-room hotel . live . https://web.archive.org/web/20171107073449/http://www.stuff.co.nz/business/86851591/christchurch-casino-to-build-85m-200room-hotel . 7 November 2017 . 28 November 2016 . .
- Web site: Clarendon Tower, Christchurch . live . https://web.archive.org/web/20210515105243/https://www.fourfoursixsix.com/projects/commercial/clarendon-tower/ . 15 May 2021 . 15 May 2021 . www.fourfoursixsix.com . en-US.
- News: McDonald . Liz . New 12-storey hotel planned for central Christchurch . live . https://web.archive.org/web/20220421062204/https://www.stuff.co.nz/the-press/news/128420748/new-12storey-hotel-planned-for-central-christchurch . 21 April 2022 . 22 April 2022 . Stuff.co.nz.
- News: McDonald . Liz . New Hotel Approved for Central Christchurch . live . https://web.archive.org/web/20231202053121/https://www.thepress.co.nz/nz-news/350121021/new-hotel-approved-central-christchurch . 2 December 2023 . 30 November 2023 . The Press.
- News: McDonald . Liz . 31 July 2024 . Another hotel planned for central Christchurch . 3 August 2024 . .
- News: Stadium soars with installation of huge roof supports . live . https://web.archive.org/web/20240119105558/https://www.thepress.co.nz/nz-news/350148374/stadium-soars-installation-huge-roof-supports . 19 January 2024 . 19 January 2024 . www.thepress.co.nz.
- Web site: Christchurch campus $220m build under way .
- Web site: Christchurch . Grand Hotels International . 23 January 2013.
- News: Demolition of quake-hit PWC building starts . 23 January 2013 . . 14 March 2012 . 17 March 2012 . https://web.archive.org/web/20120317142528/http://www.nzherald.co.nz/nz/news/article.cfm?c_id=1&objectid=10791921 . live .
- Web site: Christchurch Accommodation | Rydges Latimer Christchurch. rydges.com. 11 April 2014. 27 July 2013. https://web.archive.org/web/20130727170324/http://www.rydges.com/rydges-christchurch/. live.
- News: Gates . Charlie . Twinkle Toes checks in . 14 September 2012 . . 13 September 2012 . 14 September 2012 . https://web.archive.org/web/20120914222850/http://www.stuff.co.nz/the-press/news/7664921/Twinkle-Toes-checks-in . live .
- News: Wood . Alan . Christchurch's Holiday Inn to be demolished . 28 January 2013 . . 15 February 2012 . 26 December 2013 . https://web.archive.org/web/20131226234444/http://www.stuff.co.nz/business/rebuilding-christchurch/6419069/Christchurchs-Holiday-Inn-to-be-demolished . live .
- News: More buildings demolished in centre . 23 January 2013 . . 16 May 2012 . 18 June 2012 . https://web.archive.org/web/20120618121501/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/6928165/More-buildings-demolished-in-centre . live .
- News: Hume. Myles. Christchurch's central police station implosion. 1 June 2015. . 31 May 2015. 3 February 2016. https://web.archive.org/web/20160203132256/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/68996037/watch-christchurchs-central-police-station-implosion. live.
- News: Mathewson . Nicole . Police tower will be imploded . 25 November 2014 . . 24 November 2014 . 24 September 2015 . https://web.archive.org/web/20150924171011/http://www.stuff.co.nz/the-press/10807477/Police-tower-will-be-imploded . live .
- News: Police abandon Christchurch stations . 23 January 2013 . 29 December 2011 . 22 February 2012 . https://web.archive.org/web/20120222184205/http://www.stuff.co.nz/national/6198941/Police-abandon-Christchurch-stations . live .
- Web site: Abandoned police station to be demolished | Stuff.co.nz. 7 April 2014. stuff.co.nz. 11 April 2014. 7 April 2014. https://web.archive.org/web/20140407153744/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/9912670/Abandoned-police-station-to-be-demolished. live.
- News: Heather . Ben . Big, broken and on hit list . 25 January 2013 . . 19 March 2011 . 1 February 2014 . https://web.archive.org/web/20140201193245/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/4786468/Big-broken-and-on-hit-list . live .
- Web site: Victoria Apartments demolition begins | Stuff.co.nz. 19 January 2014. stuff.co.nz. 11 April 2014. 1 February 2014. https://web.archive.org/web/20140201193243/http://www.stuff.co.nz/the-press/news/9626916/Victoria-Apartments-demolition-begins. live.
- News: Charlie . Gates . Christchurch City Centre Demolitions Speeding Up . Stuff.co.nz . 29 September 2012 . 14 February 2013 . 23 December 2012 . https://web.archive.org/web/20121223121139/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/7744317/Our-disappearing-city-centre . live .
- Web site: Heritage tower body corporate applies to tear building... | Stuff.co.nz. 2 May 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413125223/http://www.stuff.co.nz/business/rebuilding-christchurch/8624930/Heritage-tower-demolition-applied-for. live.
- Web site: Hotel deals a big boost for central Christchurch. Stuff.co.nz. 14 April 2016. 16 April 2016. 1 October 2017. https://web.archive.org/web/20171001165625/http://www.stuff.co.nz/the-press/news/78868973/big-boost-for-central-christchurch-as-two-big-hotel-chains-buy-in. live.
- News: Wood . Alan . Millennium Hotel repairs start . 25 January 2013 . . 3 August 2012 . 5 September 2012 . https://web.archive.org/web/20120905163249/http://www.stuff.co.nz/the-press/business/7405763/Millennium-Hotel-repairs-start . live .
- Web site: Hotel chain hopeful it can rebuild in squares | Stuff.co.nz. 17 November 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413141914/http://www.stuff.co.nz/the-press/business/9410526/Hotel-chain-hopeful-it-can-rebuild-in-squares. live.
- Web site: Cathedral Square to get first new office building since earthquakes. Stuff. 7 March 2017. 14 June 2017. 19 August 2018. https://web.archive.org/web/20180819100042/https://www.stuff.co.nz/the-press/news/90143567/Cathedral-Square-to-get-first-new-office-building-since-earthquakes. live.
- News: Young . Rachel . Crowne Plaza demolition captured . 26 January 2013 . . 2 May 2012 . 15 June 2012 . https://web.archive.org/web/20120615131206/http://www.stuff.co.nz/national/6843475/Crowne-Plaza-demolition-captured . live .
- News: Williams . David . 9 June 2011 . Acclaimed tower to come down . live . https://web.archive.org/web/20110903021619/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/5119016/Acclaimed-tower-to-come-down . 3 September 2011 . 2 June 2012 . The Press.
- News: Chch high-rise apartments now on a lean . 22 January 2013 . One News . 3 March 2011 . 6 March 2011 . https://web.archive.org/web/20110306170622/http://tvnz.co.nz/national-news/chch-high-rise-apartments-now-lean-4044617? . live .
- News: Demolition continues on Grant Thornton building . 28 January 2013 . . 29 June 2012 . 30 June 2012 . https://web.archive.org/web/20120630141959/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/7193412/Demolition-continues-on-Grant-Thornton-building . live .
- Web site: Emporis- Oxford Apartments.
- News: Marc . Greenhill . Demolition about to start in northern areas . Stuff.co.nz . 14 February 2013 . 4 April 2012 . https://web.archive.org/web/20120404231032/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/6516243/Demolition-about-to-start-in-northern-areas . live .
- News: Marc . Greenhill . Government Life Building In Christchurch To Be Demolished... . Stuff.co.nz . 14 February 2013 . 18 June 2012 . https://web.archive.org/web/20120618135538/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/6916248/Government-Life-building-to-come-down . live .
- News: Wright . Michael . Armagh building to come down in April . 21 March 2013 . . 21 March 2013 . Christchurch . 23 March 2013 . https://web.archive.org/web/20130323074937/http://www.stuff.co.nz/the-press/news/8452418/Armagh-building-to-come-down-in-April . live .
- News: Hundreds watch as bank building bowled . 1 May 2013 . . 28 April 2013 . 30 April 2013 . https://web.archive.org/web/20130430231230/http://www.stuff.co.nz/the-press/business/the-rebuild/8606305/Hundreds-watch-as-bank-building-bowled . live .
- Web site: 59 Cambridge Terrace | Canterbury Earthquake Recovery Authority . Cera.govt.nz . 6 September 2012 . 14 February 2013 . 10 February 2013 . https://web.archive.org/web/20130210211855/http://cera.govt.nz/demolitions/59-cambridge-terrace . live .
- News: Gates . Charlie . Our disappearing city centre . 28 January 2013 . . 29 September 2012 . 23 December 2012 . https://web.archive.org/web/20121223121139/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/7744317/Our-disappearing-city-centre . live .
- News: Repair option to gives way to grass . 1 April 2013 . . C23 . 30 March 2013 . 2 April 2013 . https://web.archive.org/web/20130402060544/http://www.stuff.co.nz/the-press/business/8489460/Repair-option-gives-way-to-grass . live .
- Web site: 1997 . . 4 June 2012 . 3 February 2016 . https://web.archive.org/web/20160203132257/http://www.warrenandmahoney.com/en/practice/chronology/P/10/ . live .
- Web site: Te Waipounamu House 2 February 2013. CHCH EQ Photos. 5 July 2013. 3 February 2016. https://web.archive.org/web/20160203132256/https://www.facebook.com/photo.php?fbid=417470698328699&set=a.417470504995385.96849.132340030175102&type=3&theater. live.
- Web site: Farmers Car Park Building Demolition . Stuff.co.nz . 11 October 2012 . 14 February 2013 . 27 November 2012 . https://web.archive.org/web/20121127022657/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/7800497/Watch-the-Farmers-car-park-demolition . live .
- http://canterbury.royalcommission.govt.nz/documents-by-key/20120229.3509[Report on damage to building]
- Web site: Craigs Investment Partners House | Demolition Begins... | Stuff.co.nz. 6 June 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413141921/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/8765217/Tower-blocks-slammed-during-quakes. live.
- Web site: 1 April 2011 . Christchurch Buildings set for demolition, partial demolition or make safe . dead . https://web.archive.org/web/20130223042150/http://www.rebuildchristchurch.co.nz/blog/2011/4/christchurch-buildings-set-for-demolition-partial-demolition-or-make-safe . 23 February 2013 . 14 February 2013 . Rebuildchristchurch.co.nz.
- News: Mathewson . Nicole . Demolition within three months . 21 January 2013 . . 22 July 2011 . 23 July 2011 . https://web.archive.org/web/20110723212459/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/5325927/Demolition-within-three-months . live .
- News: SBS House comes down . Stuff.co.nz . 17 October 2011 . 14 February 2013.
- Web site: Leighs: Demolition work defines Christchurch . Leighsconstruction.co.nz . 14 February 2013 . 8 February 2013 . https://web.archive.org/web/20130208100221/http://leighsconstruction.co.nz/86/Demolition-work-defines-Christchurch . live .
- Web site: Brannigans Building, 86 Oxford Terrace – over the months Facebook. www.facebook.com. 29 August 2016.
- News: Nicole . Mathewson . Copthorne Hotel To Be Gone By Month's End . . 9 November 2011 . 14 February 2013 . 13 April 2014 . https://web.archive.org/web/20140413144126/http://www.stuff.co.nz/the-press/news/christchurch-earthquake-2011/5936690/Copthorne-to-be-gone-by-months-end . live .
- News: Alan . Wood . Precinct plan puts hotel hopes in limbo . . 20 March 2013 . 20 March 2013 . A13 . 13 April 2014 . https://web.archive.org/web/20140413124808/http://www.stuff.co.nz/business/rebuilding-christchurch/8449598/Precinct-plan-puts-hotel-hopes-in-limbo . live .
- Web site: Copthorne Hotel Christchurch Demolition Under Way | Stuff.co.nz. 10 July 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413124810/http://www.stuff.co.nz/the-press/business/8901642/Copthorne-Hotel-demolition-under-way. live.
- Web site: Copthorne collapses in CBD | Stuff.co.nz. 28 September 2013. stuff.co.nz. 11 April 2014. 13 April 2014. https://web.archive.org/web/20140413141910/http://www.stuff.co.nz/the-press/news/city-centre/9222092/Work-halted-after-Copthorne-collapse. live.
- Web site: CERA . CERA Media Briefing – Friday 02 September 2011: Warwick Isaacs . YouTube . 1 September 2011 . 14 February 2013 . 3 February 2016 . https://web.archive.org/web/20160203132256/https://www.youtube.com/watch?v=a-uRrabdvME . live .
- Web site: Year in review – to 30 June 2011 . AMI . 2011 . 14 February 2013 . 31 January 2012 . https://web.archive.org/web/20120131224504/http://www.ami.co.nz/Documents/Annual%20Report/2011/AMI%202011%20Year%20in%20Review-v21.pdf . live .
- Web site: Heatherlea Apartment Christchurch Demolition 15/12/2012 . . 24 January 2013 . 3 February 2016 . https://web.archive.org/web/20160203132256/https://www.youtube.com/watch?v=jXrL_r2UzBE . live .
- Web site: CTV Engineers' Buildings 'Not Being Targeted' . Stuff.co.nz . 13 December 2012 . 14 February 2013 . 16 January 2013 . https://web.archive.org/web/20130116085939/http://www.stuff.co.nz/the-press/news/8072816/Designers-buildings-not-being-targeted . live .
- Web site: Urgent Demolition For Park Terrace Ordered . 2 February 2012 . Stuff.co.nz . 14 February 2013.
- Web site: Christchurch earthquake Millbrook Apartments. flickr.com. 18 September 2012. 6 March 2013. 3 February 2016. https://web.archive.org/web/20160203132256/https://www.flickr.com/photos/shelby99/8011610899/. live.
- Web site: The Establishment Apartments – Portfolio – Warren and Mahoney. warrenandmahoney.com. 11 April 2013. 13 April 2014. https://web.archive.org/web/20140413140718/http://www.warrenandmahoney.com/en/portfolio/the-establishment-apartments/. live.