Plant | Scheme | Coordinates | Owner/operator | Refs | ||
---|---|---|---|---|---|---|
Sultan Azlan Shah Bersia Power Station | Sungai Perak | 5°25'51.1"N 101°12'33.3"E | 72 | |||
Sungai Perak | 40.5 | [1] | ||||
Sultan Azlan Shah Kenering Power Station | Sungai Perak | 5°25'47.9"N 101°12'33.2"E | 120 | |||
Sungai Piah Upper Power Station | Sungai Perak | 14.6 | ||||
Sungai Piah Lower Power Station | Sungai Perak | 54 | ||||
Sungai Perak | 5°24'20.4"N 101°17'54.7"E | 348 | ||||
Sungai Terengganu | 400 | [2] | ||||
Sungai Pergau | 600 | [3] | ||||
Sultan Yusof Jor Power Station | Cameron Highlands | 100 | ||||
Ulu Jelai Power Station (completed 2016) | Cameron Highlands | 372 | ||||
Sultan Idris Woh Power Station | Cameron Highlands | 150 | [4] | |||
Odak Power Station | Cameron Highlands | 4.2 | ||||
Habu Power Station | Cameron Highlands | 5.5 | Tenaga Nasional | |||
Kampong Raja Power Station | Cameron Highlands | 0.8 | ||||
Kampong Terla Power Station | Cameron Highlands | 0.5 | ||||
Robinson Falls Power Station | Cameron Highlands | 0.9 | Tenaga Nasional | |||
2°45'39.9"N 114°03'26.3"E | 2520 | Sarawak Energy | [5] [6] | |||
1°08'49.5"N 111°52'27.2"E | 100 | Sarawak Energy | [7] | |||
2°38'57.0"N 114°22'03.3"E | 944 | Sarawak Energy | ||||
Sungai Tenom | 5°06'55.6"N 115°54'43.7"E | 66 | Sabah Electricity | |||
Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsula with an installed generating capacity of 1,911 megawatts (MW). They are the Sungai Perak, Terengganu and Cameron Highlands hydroelectric schemes with 21 dams in operation.[8] A number of Independent Power Producers also own and operate several small hydro plants.
Independent hydroelectric schemes
Refs | |||||||
832 | Combined cycle (1 ST, 2 GT), open cycle (4 GT) | ||||||
Genting Sanyen Kuala Langat Power Plant | 720 | Combined cycle (5 GT + 1 ST) | Genting Sanyen Power Sdn Bhd | ||||
Teluk Salut Power Station | Sabah at KKIP, Sepanggar | 190 | Combined Cycle (4 GT + 2 ST) | ||||
Rugading Power Station | Sabah at KKIP, Sepanggar | 190 | Combined Cycle (2 GT + 1 ST) | ||||
Lumut GB3 Power Station | 651 | Combined cycle (1 ST), open cycle (3 GT) | |||||
Lumut Power Station | 1,303 | Combined cycle (6 GT, 2 ST)[9] | [10] | ||||
Nur Generation Plants | Kedah in Kulim High-Tech Industrial Park | 220 | Combined cycle (4 GT, 2 ST) | Nur Generation Sdn Bhd | |||
Paka power station | 808 | Combined cycle (4 GT, 2 ST) | |||||
Southern Power Generation Sdn Bhd | 1,440 | Combined cycle (2 GT, 1ST) | |||||
Petronas Gas Centralised Utilities Facilities (CUF) | Pahang (Gebeng-Kerteh) | 324 | Cogen(9 GT) | Petronas Gas Berhad | |||
Port Dickson Power Station | 440 | Open cycle (4 GT) | |||||
Prai power station | 1071 | Combined cycle (2 GT, 1ST) | |||||
625 | Open cycle (5 GT) | ||||||
Pujut Power Station | 104 | Sarawak Power Generation Sdn Bhd, a subsidiary of Sarawak Energy Berhad | [11] | ||||
Sarawak Power Generation Plant | 515 | Open cycle (2 GT) | Sarawak Power Generation Sdn Bhd, a subsidiary of Sarawak Energy Berhad | [12] | |||
Sepanggar Bay Power Plant | Sabah at Kota Kinabalu Industrial Park | 100 | Combined cycle | Sepangar Bay Power Corporation Sdn Bhd[13] | |||
729 | Thermal (2 ST), combined cycle (2 GT, 1 ST), open cycle (2 GT) | ||||||
1,136 | Combined cycle (8 GT, 4 ST) | ||||||
Tanjung Kling Power Station | 330 | Combined cycle (2 GT, 1 ST)[14] | |||||
Telok Gong Power Station 1 | Malacca at Telok Gong | 440 | Open cycle (4 GT) | ||||
Telok Gong Power Station 2 | Malacca at Telok Gong | 720 | Combined cycle (2 GT, 1ST) | ||||
Teknologi Tenaga Perlis Consortium | Perlis at Kuala Sungai Baru | 650 | Combined cycle | Teknologi Tenaga Perlis Consortium Sdn Bhd / Global E-Technic Sdn Bhd | |||
1,500 | Combined cycle (4 GT, 2 ST) | [15] | |||||
Edra Melaka Power Plant | Melaka at Kuala Sungai Baru | 2,242 | Combined cycle (3GT,3ST single shaft | Edra Power Holdings Sdn. Bhd. |
Note: GT – Gas Turbine unit(s); ST – Steam Turbine unit(s).
Balingian | Sarawak at Mukah | 600 | Thermal | Sarawak Energy | [16] | |
1,400 | Thermal (2 ST) | Jimah Energy Ventures Sdn Bhd | [17] | |||
Stesen Janakuasa Tuanku Muhriz | 1,504 | Thermal (2 ST) | Jimah Energy Ventures Sdn Bhd | [18] | ||
Stesen Janakuasa Sultan Azlan Shah | 4,100[19] | Thermal (5 ST) | TNB Janamanjung Sdn Bhd | |||
Mukah Power Station | Sarawak | 270 | Thermal (2 ST) | Mukah Power Generation Sdn Bhd, a subsidiary of Sarawak Energy Berhad | [20] | |
PPLS Power Generation Plant | 110 | Thermal (2 units) | ||||
Sejingkat Power Corporation Plant | 200 | Thermal | ||||
Selangor at Kapar | 2,420 | Thermal (6 ST), open cycle (2 GT), natural gas and coal with oil backup | Kapar Energy Ventures Sdn Bhd | |||
Tanjung Bin Power Station | 2,244 | Thermal (3 x 748MW ST) | ||||
Tanjung Bin Energy Station | 1,000 | Thermal (1 x 1000MW ST) | ||||
Gelugor Power Station | Penang at Gelugor | 398 | Combined cycle | Tenaga Nasional Berhad | |
Melawa Power Station | Sabah in Melawa | 50 | 4 diesel engines | ARL Tenaga Sdn Bhd | |
Sandakan Power Corporation Plant | 34 | 4 diesel engines | Sandakan Power Corporation Sdn Bhd | ||
Stratavest Power Station | 60 | 4 diesel engines | Stratavest Sdn Bhd | ||
Tawau Power Plant | 36 | 3 diesel engines | Serudong Power Sdn Bhd | ||
Bumibiopower Sdn Bhd (planning approved 2001) | 6 | Empty fruit bunch | ||||
Jana Landfill Sdn Bhd | 2 | Biogas | ||||
TSH Bio Energy Sdn Bhd | 14 | Steam turbines | Empty fruit bunch | |||
Potensi Gaya Sdn Bhd (planning approved 2003) | 7 | Steam turbines | Empty fruit bunch | |||
Alaff Ekspresi Sdn Bhd (planning approved 2003) | 8 | Steam turbines | Empty fruit bunch | |||
Naluri Ventures Sdn Bhd (license ended in 2010) | 12 | Steam turbines | Empty fruit bunch | |||
Seguntor Bioenergy Sdn Bhd (planning approved 2007) | 11.5 | Steam turbines | Empty fruit bunch | |||
Kina Biopower Sdn Bhd (planning approved 2007) | 11.5 | Steam turbines | Empty fruit bunch | |||
Recycle Energy Sdn Bhd (commercial operation 2009) | 8.9 | Steam turbine | Refuse-derived fuel | |||
FTJ Bio Power Sdn Bhd (Jengka Advance Renewable Energy Plant) | 12 | Steam turbines | Empty fruit bunch |
Pulau Perhentian Kecil, Terengganu with a combined capacity of 650[21] kilowatts