Native Name: | 上海地铁21号线 |
Native Name Lang: | zh |
Other Name: | Line 24 (between 2014 and 2016) |
Type: | Rapid transit |
System: | Shanghai Metro |
Status: | Under construction |
Locale: | Pudong, Shanghai |
End: | Liuchen Road |
Stations: | 28 |
Operator: | Shanghai Maglev Development Co., Ltd. |
Depot: | Liuchen Road Depot |
Stock: | Class A 6-car trains |
Tracklength: | 48km (30miles) |
Tracks: | 2 |
Electrification: | Overhead lines (1500 volts) |
Speed: | 100km/h |
Map State: | collapsed |
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about long with 10 stations.[1] Stations will have passing loops to allow for express and local stopping patterns.[2]
The line was announced by the Municipal government in 2016.[3] [4] Previous plans in 2014 designated the Disney Resort — Guanglan Road section as Line 24.
Segment | Commenced | Opened | Length | Station(s) | Name | Investment | |
---|---|---|---|---|---|---|---|
Dongjing Road - Tanghuang Road | 4 Jan 2022 | exp 2026 | 27.9641NaN1 | 17 | Phase 1 | 36.956 billion yuan | |
Tanghuang Road - Shanghai East Railway Station | end-2023 | exp 2027 | 141NaN1 | 5 | Phase 2 | ||
Shanghai East Railway Station - Pudong Airport T3 Terminal | exp 2028 | 21NaN1 | 1 | Phase 2 | |||
Dongjing Road - Wusongkou International Cruise Terminal | planned | 9 | Phase 3 | ||||
| ||||||||||
0.0 | Baoshan | Phase III | ||||||||
Pudong | ||||||||||
(planned) | ||||||||||
● | ● | 0.0 | Pudong | Phase I 2026 | ||||||
● | ● | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | |||||||||
● | ● | |||||||||
● | | | 28 | ||||||||
● | | | Pudong | East extension (Phase II) 2027 | |||||||
● | | | |||||||||
● | | | |||||||||
● | | | |||||||||
● | ● | Shanghai East railway station | (planned) (u/c) | |||||||
● | ● | 44 | East extension (Phase II remaining section) 2028 | |||||||
The line will interchange with various lines in Pudong at the following stations: