Type: | Rapid transit |
System: | Zhengzhou Metro |
Status: | Operational |
Locale: | Zhengzhou, Henan, China |
Start: | Jiahe |
End: | Nansihuan (through service Zhengzhou Hangkonggang Railway Station) |
Stations: | 22 |
Owner: | Zhengzhou |
Operator: | Zhengzhou Metro Group Corporation |
Character: | Underground |
Depot: | Chengnan Depot |
Linelength: | 30.91NaN1[1] |
Tracks: | 2 |
Electrification: | Overhead lines (1500 volts) |
Map State: | collapsed |
Line 2 of the Zhengzhou Metro is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.[2]
Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.[3]
The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016.[4] The second phase of the line began operations on 28 December 2019.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Liuzhuang — Nansihuan | 19 August 2016 | 20.6492NaN2 | 16 | Phase 1 | |
Jiahe — Liuzhuang | 28 December 2019 | 10.252NaN2[5] | 6 | Phase 2 |