HCMC Metro Line 2 explained

Line 2
Tuyến số 2
Type:Rapid transit
System: Ho Chi Minh City Metro
Status:Under construction
Locale:Ho Chi Minh City, Vietnam
Stations:11
42
Planopen:2030 - 2032 (planned)[1]
Operator:Management Authority of Urban Railways in Ho Chi Minh City (MAUR)
Depot:Tham Lương
Linelength:11.3km (07miles)
48km (30miles)

Line 2 is a under construction rapid transit line of the HCMC Metro, Vietnam.[2] [3] Line 2 is the city's second metro line, and will connect District 1 and District 12.[4] Construction began in February 2024, with an expected completion date of 2030.[5] [6] [7] The total project length is 11.3sp=usNaNsp=us long with eleven stations.

The implementation is provided by the Asian Development Bank (ADB), the German Development Bank (KfW), and the European Investment Bank (EIB). The project's total cost is .[8]

Route

This metro line starts at Bến Thành Market, passes through Phạm Hồng Thái, Cách Mạng Tháng Tám, and Trường Chinh streets, and ends at Tham Lương depot.[9]

Construction

The project comprises seven construction packages.

Stations

PhaseStation numberStation nameLayoutTransfersLocation
TotalCurrent phase (1)WardDistrict
21UndergroundNorth–South Express railway (planned)
Thủ Thiêm–Long Thành Light Rail (planned)
An PhúThủ Đức
2UndergroundAn Khánh
3"International Hospital" (Bệnh Viện Quốc Tế)UndergroundAn Lợi Đông
4"Young Pioneer Palace" (Cung Thiếu Nhi)Underground Monorail 2 (planned)Thủ Thiêm
5"Arc Avenue" (Đại Lộ Vòng Cung)Underground
6Underground Tramway (planned)Nguyễn Thái BìnhDistrict 1
171Underground (under construction)
(planned)
(planned)
Bến Thành
82Underground (planned)
93UndergroundVõ Thị SáuDistrict 3
104UndergroundNorth–South RailwayWard 10
115UndergroundWard 11
126UndergroundWard 5Tân Bình
137Underground (planned)Phường 4
148UndergroundPhường 14
159Underground (planned)Phường 13
1610UndergroundPhường 15
1711Elevated
218ElevatedTân Thới NhấtDistrict 12
19ElevatedĐông Hưng Thuận
20ElevatedTrung Mỹ Tây
321Elevated
22ElevatedTân XuânHóc Môn
23Elevated
24ElevatedHóc Môn
25ElevatedTân Thới Nhì
26Elevated
27Elevated
28ElevatedTân Phú TrungCủ Chi
29"District Road 7" (Hương lộ 7)Elevated
30Elevated
31Elevated
32ElevatedTân Thông Hội
33Elevated
34Elevated
35ElevatedCủ Chi
436"Củ Chi Hospital" (Bệnh viện Củ Chi)ElevatedTân An Hội
37Elevated
38ElevatedPhước Hiệp
39Elevated
40Elevated
41ElevatedPhước Thạnh
42"Provincial Road 7" (Tỉnh lộ 7)Elevated

Rolling stock

The rolling stock has not been announced yet, and in February 2024, German company Siemens was in talks with the government to build urban rail lines, including the HCMC Metro Line 2.[10] Line 2 will use an electric multiple units. By 2030, it will use 3-car trains, then increase to 6 cars. Each train is 22 m long, 3.15 m wide, and 3.865 m high. Maximum axle load is 16 tons. The design speed is 90 km/h. Maximum operating speed is 80 km/h. The signaling system uses modern technology, ensuring scientific, efficient and safe train operation with automatic train control systems, automatic train monitoring, computer-based interlocking, train speed detection and measurement, data signal transmission, signal display system, depot signaling and interlocking system, disaster warning system and other auxiliary systems.[11]

References

  1. [:vi:Tuyến số 2 (Đường sắt đô thị Thành phố Hồ Chí Minh)]
  2. Web site: VnExpress . HCMC's 2nd metro line awaits construction 12 years since approval - VnExpress International . 2022-10-18 . VnExpress International – Latest news, business, travel and analysis from Vietnam . en.
  3. Web site: Vietnam's Metro Rail Lines Lumber Toward Completion . 2022-10-18 . thediplomat.com . en-US.
  4. Web site: The Metro Line 2 . 2022-10-18 . maur.hochiminhcity.gov.vn.
  5. Web site: Vietnam business hub breaks ground on Metro Line 2 . 2024-02-19 . Nikkei Asia . en-GB.
  6. Web site: VietnamPlus . 2022-03-02 . Completion schedule of HCM City Metro Line No.2 extended to 2030 Society Vietnam+ (VietnamPlus) . 2022-10-18 . VietnamPlus . en.
  7. Web site: VnExpress . HCMC shifts parking lot focus from underground to high above - VnExpress International . 2022-10-18 . VnExpress International – Latest news, business, travel and analysis from Vietnam . en.
  8. Web site: Metro line No. 2 completion deadline extended to 2030 in HCMC . 2024-11-22 . theinvestor.vn . en.
  9. Web site: Phác họa hình hài tuyến metro số 2 TPHCM (Bến Thành – Tham Lương) . 2024-11-22 . ashui.com.
  10. Web site: thanhnien.vn . Metro số 2 TP.HCM: tin tức, hình ảnh, video, bình luận mới nhất . 2024-11-13 . thanhnien.vn . vi.
  11. Web site: ONLINE . TUOI TRE . 2020-12-16 . Metro số 2 Bến Thành - Tham Lương tuyến metro xuyên tâm dài nhất TP.HCM . 2024-11-22 . TUOI TRE ONLINE . vi.