Krishnarajapura metro station explained

Krishnarajapura
Other Name:KR Pura
Style:Namma Metro
Address:NH 44, Chinappa Colony, Mahadevapura, Bengaluru, Karnataka 560016
Coordinates:13°N 77.6779°W
Structure:Elevated, Double track
Platform:Side platform


Side platform (TBC)

Levels:2 (Operational under Purple Line)
2 (Under Construction under Blue Line)
Tracks:2
Connections: KR Puram Railway Station
Parking: Two & Four Wheelers
Opening: (TBC)
Electrified:750 V DC third rail
Accessible:Yes
Status:Staffed
Code:KRAM
Owned:Bangalore Metro Rail Corporation Ltd (BMRCL)
Operator:Namma Metro
Map State:collapsed
Mapframe:yes
Mapframe-Marker:rail
Mapframe-Zoom:14

Krishnarajapura (abbreviated as K.R. Pura) is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India.[1] This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more.[2] [3] This station under Blue Line[4] is planned to be operational around the year 2026 (TBC).[5]

The Whitefield - Krishnarajapura trial runs were successfully conducted (under Purple Line) from 25 October for a month.[6] This metro station (under Purple Line) was inaugurated on March 25, 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26, 2023.[7] [8] [9] [10] [11] [12]

History

Blue Line

In December 2019, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the metro station, part of the 8.377 km Reach 2A – Package 2 (Kodibeesanahalli - Krishnarajapura) of the 18.236 km Blue Line of Namma Metro. On 13 October 2020, Shankaranarayana Constructions (SNC) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [13] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms.

Station layout

- Station Layout

GStreet levelExit/Entrance
valign=topL1valign=topMezzaninevalign=topFare control, station agent, Metro Card vending machines, crossover
L2Side Platform Doors will open on the left
Platform 1
Eastbound
Towards → Whitefield (Kadugodi)
Next Station: Singayyanapalya
Platform 2 WestboundTowards ←
Next Station: Benniganahalli
Side Platform Doors will open on the left
L2
- Station Layout - To Be Confirmed
GStreet levelExit/Entrance
valign=topL1valign=topMezzaninevalign=topFare control, station agent, Metro Card vending machines, crossover
L2Side Platform Doors will open on the left
Platform #
Eastbound
Towards → Central Silk Board
Next Station: Sarasvathi Nagar
Platform # WestboundTowards ←
Next Station: Kasturi Nagar
Side Platform Doors will open on the left
L2

Connections

This metro station is connected with Krishnarajapuram of Indian Railways network.

Entry/Exit

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

See also

External links

__FORCETOC__

Notes and References

  1. Web site: Whitefield metro line: Ahead of inauguration, names of six stations changed.
  2. Web site: Baiyappanahalli-Whitefield Metro stretch to have 13 stops . 2022-06-21 . The New Indian Express.
  3. Web site: Rustagi . Abha . 2022-05-05 . Baiyappanahalli-Whitefield Line to be functional from Dec 2022 . 2022-06-21 . Metro Rail News . en-US.
  4. Web site: Bengaluru Metro Blue Line: Explore the City Like Never Before! - TimesProperty . 2023-12-14 . timesproperty.com.
  5. News: 28 November 2022 . Christin Mathew . Philip . Bangalore Metro Rail Corporation Limited plans combined station for 2 lines at Iblur . 2022-11-28 . The Times of India . en.
  6. Web site: 2022-10-05 . Baiyappanahalli-Whitefield metro line trial from October 25 . 2022-10-06 . Deccan Herald . en.
  7. Web site: 2023-03-26 . Metro finally comes to Whitefield, take a ride on March 26 from 7 am! . 2023-03-26 . Deccan Herald . en.
  8. Web site: 2022-11-25 . Bengaluru Metro: Much awaited metro line between Whitefield to KR Puram to be operational by March . 2022-11-28 . TimesNow . en.
  9. News: Bureau . The Hindu . 2023-02-03 . Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes . en-IN . The Hindu . 2023-02-03 . 0971-751X.
  10. Web site: ಮಾರ್ಚ್ 25ಕ್ಕೆ ವೈಟ್‌ಫೀಲ್ಡ್-ಕೆಆರ್ ಪುರಂ ಮೆಟ್ರೋ ಸೇವೆ ಲೋಕಾರ್ಪಣೆ? . 2023-03-14 . Kannadaprabha . kn.
  11. Web site: BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes . https://web.archive.org/web/20230302093410/https://www.newindianexpress.com/cities/bengaluru/2023/mar/02/bmrcl-to-zoom-metro-from-kr-puramto-whiefield-in-22-minutes-2552223.html . dead . 2 March 2023 . 2023-03-02 . The New Indian Express.
  12. Web site: 2023-03-05 . Namma Metro: Why upcoming Whitefield stretch is a game changer for Bengaluru? . 2023-03-05 . TimesNow . en.
  13. Web site: 2020-10-13 . Afcons & Shankaranarayana Win Bangalore Metro Phase 2A ORR Work . 2024-10-24 . The Metro Rail Guy . en-US.