Official Name: | Kribi |
Pushpin Map: | Cameroon |
Pushpin Label Position: | above |
Pushpin Map Caption: | Location in Cameroon Placement on map is approximate |
Subdivision Type: | Country |
Subdivision Name: | Cameroon |
Subdivision Type1: | Province |
Subdivision Name1: | South |
Subdivision Type2: | Department |
Subdivision Name2: | Océan |
Unit Pref: | Metric |
Population As Of: | 2012 |
Population Footnotes: | [1] |
Population Total: | 80957 |
Population Blank1 Title: | Ethnicities |
Population Blank2 Title: | Religions |
Coordinates: | 2.935°N 9.91°W |
Elevation M: | 13 |
Kribi is a beach resort and sea port in Cameroon.
The coastal town of Kribi lies on the Gulf of Guinea, in Océan Department, South Province, at the mouth of the Kienké River. This location, lies approximately 150km (90miles), by road, south of Douala, the largest city in Cameroon and the busiest seaport in the country.[2] The coordinates of Kribi are: 2° 56' 6.00"N, 9° 54' 36.00"E (Latitude: 2.9350; Longitude: 9.9100)
It has an estimated population of 55,401.[3] It services sea traffic in the Gulf of Guinea and also lies near the terminus of the Chad-Cameroon pipeline. The Lobé Waterfalls are nearby and there is a road inland, through the Littoral Evergreen Forest, as far as Bipindi and Lolodorf where native communities of Pygmies are found.
A January 2024 study[4] found high levels of parasitic worm eggs and larvae in waters along Kribi's famed beach. The species included tapeworms and nematode worms that cause significant morbidity in humans, likely passed from human fecal material in waste water.
Kribi Power Development Company (KPDC) has built a natural gas-powered electricity generating plant, Kribi Power Station, in the community of Mpolongwe, approximately 10km (10miles), north of the Kribi central business district. The 216 MW plant that cost US$390 million (CFA:176.3 billion) to build,[5] came on line in 2013. It is now owned by Globeleq[6] A second phase expansion is planned.
Near Kribi is the location of a proposed port for the export of iron ore from about 500km (300miles) away and also bauxite. Since there is no natural harbour at Kribi, the port itself would be several kilometres offshore where deepwater of at least 20m (70feet) is suitable for large Capesize ships. [7] It is also the location for the Kribi Lighthouse.
By 2017, the port development had started,[8] and by 2020 the port was being developed by Louis Berger.[9]
The port will be served by railways of two different gauges, 1435mm and 1000mm. There will be a new 130km rail link between the port and the existing metre gauge network at Edéa. Dual gauge sleepers could be installed so that the new lines are compatible with the proposed African Integrated High Speed Rail Network (AIHSRN).
The iron ore will come from mines near Mbalam in Cameroon and near Nabeba in Republic of Congo. The mines would have an output of approximately 35 million tonnes per year, with a 30-year or so lifespan.[10] This line is to be standard gauge lines (1435mm) with a 37.5t axle load. In 2021, a contract was let to build the rail line to Mbalam. [11]
It is proposed to connect the port of Kribi to a new bauxite mine in the north of Cameroon at Minim, Martap with a metre gauge (1000mm) 20t axle load railway.[12] [13] [14] A link line junctions from the Camrail line at Edéa and proceeds 110km to Kribi.
Kribi is twinned with:
Kribi has a tropical monsoon climate (Köppen climate classification Am). Due to its equatorial position, Kribi sees a short, fairly dry season and a long, very wet season. The hottest month, February, has an average high temperature of 32 C (89.6 F), and an average low of 25 C (77 F). The wettest month, September, sees 483mm of rain. 27 of the 30 days in September see rain. The driest month, December, sees 59mm of rain. The coldest month is August, with an average high of 28 C (82.4 F), and a low of 23 C (73.4 F). Humidity remains high year-round.