Kolkata Metro Line 3 Explained


----
Color:ab1afb
Type:Rapid transit
System:Kolkata Metro
Status:Phase 1 - Operational
Phase 2 - Under Construction
Phase 3 - Planned
Locale: Kolkata Metropolitan Region, India
Start:• Diamond Park (South)
End:Esplanade (North)
Stations:14
___
07 (operational)
05 (under construction)
02 (planned)
Daily Ridership:615
Owner:Indian Railways
Operator:Metro Railway, Kolkata
Character:elevated and underground
Depot:Joka Metro Depot
Stock:ICF\MEDHA
Linelength:
  • 18.47km (11.48miles)
    -Operational:7.75km (04.82miles)
    -Under Construction:7.33km (04.55miles)
    -Planned:3.39km (02.11miles)[1]
Tracks:2
Gauge: broad gauge
Electrification:750 V DC using third rail
Speed: (designed)
Signalling:CBTC signalling

Line 3 is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. A 6.5km (04miles) stretch from Joka to Taratala of this line was inaugurated on 30 December 2022[2] [3] and after extended to Majerhat on 6 March 2024.[4] This line will span 15.08km (09.37miles) from Joka in the south to Esplanade in the north with a future southward extension of 3.39km (02.11miles) to Diamond Park from Joka.[5] It will connect Blue Line at Park Street in central Kolkata and run in parallel with Blue Line up to Esplanade where it will connect with Green Line also. Line 3 is being built by Rail Vikas Nigam Limited.

Development

Around 8.5km (05.3miles) of the project will be elevated and the rest of 6.32km (03.93miles) of the metro line will be underground.[3] The project is getting delayed due to nonavailability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[6] Tenders for its construction and plant & machinery were invited in April 2020.[7]

Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.

Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.

By 15 September 2022, the stretch from Joka to Taratala has been fully constructed and electrification has been done. Testing trials are underway from Joka to Taratala using the old decommissioned Metro Rakes. Eventually in service there will be new air conditioned metro rakes. The stretch from Majerhat to Esplanade is under construction.

Prime Minister Narendra Modi inaugurated the Joka-Taratala stretch, including Joka metro station of Kolkata Metro's Purple Line on 30 December 2022 in the presence of West Bengal Chief Minister Mamata Banerjee and Indian Railway Minister Ashwini Vaishnaw. Some students from schools especially St Thomas Boys School, whose premises are utilised for planned Khidirpur metro station in this stretch, were granted the rare opportunity to be the first ones to ride in this Joka-Taratala stretch after the inauguration.[8] [9] [10]

After lot of hardships and developmental work the Taratala-Majerhat section of Kolkata Metro Line 3 was inaugurated on 6 March 2024 by Prime Minister Narendra Modi, along with the truncated sections of Esplanade-Howrah Maidan under Line 2 and Kavi Subhash-Hemanta Mukhopadhyay under Line 6.[11] The Mominpur-Esplanade section is expected to be open in 2028. [12]

List of stations

See main article: List of Kolkata metro stations. The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot was built by RVNL in Joka. The tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for has been sanctioned in the Budget of 2012–13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.

There are 3 phases in this line-

Line 3 (Purple Line)
No.Station NameLocationPhaseOpeningConnectionsLayoutCoordinatesNotes
EnglishBengali
1Diamond Parkডায়মন্ড পার্কJoka3Planned Vivekananda Mission School Bus StopElevated
2IIM Calcuttaআইআইএম
3 জোকাJoka1AOperational Joka bus Depot

Diamond Park Bus Stop

ElevatedAlso known as Diamond Park
4ঠাকুরপুকুরThakurpukur Thakurpukur Police Station Bus Stop

Thakurpukur Bazar Bus Stand

5সখেরবাজারBehala Thakurpukur Bus Depot

Silpara Bus Stop

Behala Sakherbazar Minibus Stand

Kadamtala Bus Stand

Also known as Silpara
6বেহালা চৌরাস্তা Behala Chowrasta Bus Stand
7বেহালা বাজার Behala Bazar Bus Stop
8তারাতলাTaratala Ajanta Cinema Bus Stop

Taratala Bus Stand

Also known as Pathakpara
9মাঝেরহাটMajerhat1B Majerhat Station DH Road Mint Bus Stop

Majherhat Gurudwara Bus Stop

10মোমিনপুরMominpore2AUnder Construction Mominpore Bus StopElevated
11খিদিরপুরKidderpore2B Khidderpore Bus StopUnderground
12ভিক্টোরিয়াMaidan Victoria Memorial Bus Stop

PG Hospital Bus Stop

Birla Planetarium Bus Stop

Also known as Hastings
13পার্ক স্ট্রিটPark Street
Park Street (U/C)
----
Park Street Bus Stop
14এসপ্ল্যানেডEsplanade
Esplanade

Esplanade
----

Esplanade Bus Terminus (WBTC,SBSTC,NBSTC)

Esplanade Tram Depot

International Bus Terminus. Also known as Dharmatala / Chowringhee

See also

Notes and References

  1. News: Kolkata Metro Map.
  2. Web site: 2022-12-30 . Kolkata Metro: First glimpse of Joka-Taratala route in pics . 2022-12-30 . mint . en.
  3. Web site: Kolkata: Work on fast track as East-West Metro eyes new links in next two years Kolkata News - Times of India. Bandyopadhyay. Krishnendu. The Times of India. en. 2019-06-28. June 10, 2019. Ajanta . Chakraborty.
  4. News: PM Modi unveils multiple metro projects, including Kolkata underwater corridor. The Hindu. 6 March 2024. 6 March 2024. en.
  5. News: Kolkata Metro Line 3.
  6. Web site: Work begins at Joka Metro depot, wall built Kolkata News - Times of India. Bandyopadhyay. Krishnendu. March 1, 2019. The Times of India. en. 2019-06-28.
  7. Web site: RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot. 2020-04-28. The Metro Rail Guy. en-US. 2020-04-29.
  8. News: Kolkata Metro: First glimpse of Joka-Taratala route in pics . 30 December 2022 . www.livemint.com . 30 December 2022 . en.
  9. Web site: In-pics: Inaugration of Vande Bharat Express, Joka-Taratala Metro & more news from Kolkata . 2022-12-31 . www.telegraphindia.com.
  10. News: 2020-12-18 . Another school demands Metro route tweak . The Times of India . 2023-05-02 . 0971-8257.
  11. News: 2024-02-19 . Hope for ops start of three new Metro links in March first week . 2024-02-21 . The Times of India . 0971-8257.
  12. Web site: MP . Team . 2023-10-10 . RVNL targets completion of Majerhat to Esplanade Metro stretch within 48 months . 2024-03-17 . www.millenniumpost.in . en.