Kalyan Nagar | |
Style: | Namma Metro |
Address: | 2nd A Cross Rd, HRBR Layout 2nd Block, East of NGEF Layout, Dooravani Nagar, Bengaluru, Karnataka 560043 |
Coordinates: | 13.0263°N 77.6378°W |
Structure: | Elevated, Double track |
Platform: | Side platform (TBC) Platform-1 → / Platform-2 → Platform Numbers (TBC) |
Operator: | Namma Metro |
Levels: | 2 (TBC) |
Tracks: | 2 (TBC) |
Connections: | Kalyan Nagar BMTC Bus Depot and Bus Stop |
Parking: | (TBC) |
Opening: | (TBC) |
Electrified: | (TBC) |
Accessible: | (TBC) |
Status: | Under Construction |
Code: | KLN (TBC) |
Owned: | Bangalore Metro Rail Corporation Ltd (BMRCL) |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Kalyan Nagar is an upcoming elevated metro station on the North-South corridor of the Blue Line[1] of Namma Metro in Bangalore, India. Around this metro station holds the main Kalyan Nagar BMTC Bus Depot cum Bus Stop followed by many prime Jewellery retail stores like Lalitha Jewellery, Tanishq, Kalyan Jewellers, Jos Alukkas and neighbouring Kammanahalli, Hennur and Chelekkere suburban areas. This metro station is slated to become operational around June 2026.[2] [3] [4] [5]
On November 17 2020, the Bangalore Metro Rail Corporation Limited (BMRCL) invited bids for the construction of the Kalyan Nagar metro station, part of the 11 km Reach 2B – Package 1 (Krishnarajapura - Kempapura) of the 37.692 km Blue Line of Namma Metro. On September 14 2021, Nagarjuna Construction Company Ltd. (NCC Ltd.) was chosen as the lowest bidder for this segment, with their proposal closely matching the initial cost estimates. [6] As a result, the contract was awarded to the company, which led to the beginning of the construction works of this metro station as per the agreed terms. [7]
Station Layout - To Be Confirmed
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |||
Platform # Southbound | Towards → / Next Station: HRBR Layout | ||||
Platform # Northbound | Towards ← Next Station: HBR Layout | ||||
Side platform | Doors will open on the left | ||||
L2 | |||||
__FORCETOC__