E131 series | |
Manufacturer: | Japan Transport Engineering Company |
Factory: | Akiha-ku, Niigata |
Replaced: | 205 series, 209-2000/2100 series |
Yearconstruction: | 2020−Present |
Yearservice: | 13 March 2021 |
Numberbuilt: | 141 vehicles (47 sets) |
Numberservice: | 141 vehicles (47 sets) |
Formation: | 2–4 cars per trainset |
Lines: | Kashima Line, Narita Line, Nikkō Line, Sotobō Line, Uchibō Line, Sagami Line, Utsunomiya Line, Tsurumi Line |
Carbody: | Stainless steel |
Carlength: |
|
Width: | 2.95m (09.68feet) |
Height: |
|
Floorheight: | 1.13m (03.71feet) |
Doors: | 4 pairs per side |
Maxspeed: | 110km/h |
Traction: | Hitachi hybrid-SiC/IGBT–VVVF |
Traction Motors: | MT83 150kW 3-phase AC induction motor |
Transmission: | 7.07:1 (99:14) gear ratio |
Electricsystem: | overhead catenary |
Collectionmethod: | Pantograph |
The is a DC electric multiple unit (EMU) train type operated by the East Japan Railway Company (JR East). It began operations in the Chiba area on 13 March 2021, on the Sagami Line on 18 November 2021, and on the Nikkō Line and the Utsunomiya Line on 12 March 2022. The trains are equipped for driver-only operation .
The E131 series trains have stainless steel bodies.[1] They have LCD passenger information displays above the doors, as well as wheelchair-accessible and stroller-accessible "free spaces" on all cars. As they are equipped for "wanman" driver-only operation, body-mounted cameras are utilized to monitor passengers boarding and alighting the train; these cameras are then fed to displays located in the driver's cab.[2] They also feature semi-automatic doors, allowing passengers to operate the doors during driver-only operation.
Internally, the trains are equipped with security cameras and emergency call switches.
Some trains in each subseries are numbered -X80, as they have a slightly different equipment configuration due to the presence of track monitoring equipment.
The series and its scheduled introduction into the Sotobō Line (Kazusa-Ichinomiya Station - Awa-Kamogawa Station), Uchibō Line (Kisarazu Station - Awa-Kamogawa Station), and Kashima Line (Sawara Station - Kashimajingū Station) was announced on 5 May 2020.[3] It was the first all-new series introduced in the region in 51 years since the 113 series in the late 1960s;[4] [5] the previous 211 series and 209 series were transferred from other lines. On 18 December 2020, it was further announced that the series would operate certain services in the Narita Line (between Narita Station and Katori Station) and Kashima Line (between Katori Station and Sawara Station).[6] [7]
On 17 June 2021, JR East announced that a new subseries will be introduced on the Sagami Line (Chigasaki Station - Hashimoto Station) in fall 2021,[8] and another subseries will be introduced into the Nikkō Line (Utsunomiya Station - Nikkō Station) and the Utsunomiya Line (Oyama Station - Kuroiso Station) in Spring 2022.[9]
E131-0/-80 series | |
Interiorimage: | Series-E131-0 Inside.jpg |
Interiorcaption: | Interior (October 2021) |
Replaced: | 209-2000/2100 series |
Yearconstruction: | 2020−2021 |
Yearservice: | 13 March 2021 |
Numberbuilt: | 24 vehicles (12 sets) |
Numberservice: | 24 vehicles (12 sets) |
Formation: | 2 cars per trainset |
Fleetnumbers: | R01–R12 |
Operator: | JR East |
Depots: | Makuhari |
Trainlength: | 40m (130feet) (including couplers) |
Traction Motors: | 4 × 150kW |
Poweroutput: | 600kW |
Uicclass: | Bo′Bo′+2′2′ |
A total of 12 two-car sets were ordered and built. Test runs began in July 2020, starting with the first two delivered sets R01 and R02.[10] The first ten sets (R01–R10) entered passenger service on 13 March 2021.[11]
The trains are painted in the Uchibo/Sotobo Line color scheme and formed as two-car sets with four doors per car.[12]
The series serves the following sections of lines:[6]
, 12 two-car sets (R01–R12) are based at Makuhari Rolling Stock Centre in Chiba Prefecture and formed with 1 motored ("M") car and 1 trailer ("T") car.
← Kashimajingū, Kazusa-Ichinomiya Narita, Kisarazu → | |||
Designation | Mc | Tc' | |
---|---|---|---|
Numbering | KuMoHa E131-0/-80 | KuHa E130-0/-80 |
Passenger accommodation consists of a combination of longitudinal and transverse seating. Priority seating and wheelchair- and stroller-accessible "free spaces" are provided in each car. KuHa E130 features a universal design toilet.
The table below shows the details of each set.
Set No. | Delivery date | Leading car | Trailing car | |
---|---|---|---|---|
R01 | 21 July 2020[14] | KuMoHa E131-1 | KuHa E130-1 | |
R02 | KuMoHa E131-2 | KuHa E130-2 | ||
R03 | 28 August 2020[15] | KuMoHa E131-3 | KuHa E130-3 | |
R04 | KuMoHa E131-4 | KuHa E130-4 | ||
R05 | 10 October 2020[16] | KuMoHa E131-5 | KuHa E130-5 | |
R06 | KuMoHa E131-6 | KuHa E130-6 | ||
R07 | 26 November 2020[17] | KuMoHa E131-7 | KuHa E130-7 | |
R08 | KuMoHa E131-8 | KuHa E130-8 | ||
R09 | 12 February 2021 | KuMoHa E131-9 | KuHa E130-9 | |
R10 | KuMoHa E131-10 | KuHa E130-10 | ||
R11 | 2 March 2021[18] | KuMoHa E131-81 | KuHa E130-81 | |
R12 | 19 March 2021[19] | KuMoHa E131-82 | KuHa E130-82 |
E131-500/-580 series | |
Interiorimage: | Series-E131-500 Inside.jpg |
Interiorcaption: | Interior (November 2021) |
Replaced: | 205-500 series |
Yearconstruction: | 2021–2022 |
Yearservice: | 18 November 2021 |
Numberbuilt: | 48 vehicles (12 sets) |
Numberservice: | 48 vehicles (12 sets) |
Formation: | 4 cars per trainset |
Fleetnumbers: | G-01 – G-12 |
Operator: | JR East |
Depots: | Kōzu |
Lines: | Sagami Line |
Trainlength: | 80m (260feet) (including couplers) |
Traction Motors: | 8 × 150kW |
Poweroutput: | 1.2MW |
Uicclass: | Bo′Bo′+2′2′+Bo′Bo′+2′2′ |
A total of 12 four-car trains were built for the Sagami Line; the first set (G-01) entered service on 18 November 2021.[20] It replaced the existing 205-500 series trains that have been in service since 1991.
These trains were also used on through services between the Sagami Line and Yokohama Line during the morning and evening rush; these services ended on 11 March 2022.[21]
The series serves the following sections of lines:
, twelve four-car sets (G-01–G-12) are based at Kōzu Depot in Kanagawa Prefecture and formed with 2 motored ("M") cars and 2 trailer ("T") cars. Sets G-11 and G-12 are fitted with track monitoring equipment.[22]
← Hachiōji, Hashimoto Chigasaki → | |||||
Car No. | 4 | 3 | 2 | 1 | |
---|---|---|---|---|---|
Designation | Mc | T | M | Tc' | |
Numbering | KuMoHa E131-500/-580 | SaHa E131-500 | MoHa E130-500 | KuHa E130-500/-580 |
Passenger accommodation consists of longitudinal seating throughout.[13] Priority seating and wheelchair- and stroller-accessible "free spaces" are provided in each car.[13]
E131-600/-680 series | |
Interiorimage: | Series-E131-600 Inside.jpg |
Interiorcaption: | Interior (March 2022) |
Replaced: | 205-600 series |
Yearconstruction: | 2021–2022 |
Yearservice: | 12 March 2022 |
Numberbuilt: | 45 vehicles (15 sets) |
Numberservice: | 45 vehicles (15 sets) |
Formation: | 3 cars per trainset |
Fleetnumbers: | TN1–TN15 |
Operator: | JR East |
Depots: | Oyama |
Trainlength: | 60m (200feet) (including couplers) |
Traction Motors: | 6 × 150kW |
Poweroutput: | 900kW |
Uicclass: | Bo′Bo′+2′Bo′+2′2′ |
A total of 15 three-car trains were built for the Nikkō Line and Utsunomiya Line. The first fourteen sets (TN1–TN14) entered service on 12 March 2022.[23] It replaced the existing 205-600 series trains that have been in service since 2013.
The series serves the following sections of lines:
, 15 three-car sets (TN1–TN15) are based at Oyama Depot in Tochigi Prefecture and formed with 2 motored ("M") cars and 1 trailer ("T") car (the MoHa E131 car has one motorized bogie and one trailer bogie). Sets TN14 and TN15 are fitted with track monitoring equipment.
Designation | Mc | M1 | Tc' | |
---|---|---|---|---|
Numbering | KuMoHa E131-600/-680 | MoHa E131-600 | KuHa E130-600/-680 |
E131-1000 series | |
Interiorimage: | Series-E131-1000 Moha-E131-1007 Inside.jpg |
Interiorcaption: | Interior (April 2024) |
Replaced: | 205-1100 series |
Yearconstruction: | 2023 |
Numberbuilt: | 24 vehicles (8 sets) |
Formation: | 3 cars per trainset |
Fleetnumbers: | T1–T8 |
Lines: | Tsurumi Line |
Width: | 27780NaN0 |
Maxspeed: | 1000NaN0 |
JR East announced in July 2023 that it would introduce eight 3-car E131-1000 series[24] sets on the Tsurumi Line to replace the aging 205 series fleet.[25] Unlike other E131 series variants, these sets use straight-sided bodywork with a width of, as opposed to with previous sets.[26] They entered service on 24 December 2023.[27]
The first two sets, T1 and T2, were built at J-TREC's Niitsu plant and commissioned from October 2023.[28] The last set, T8, was commissioned in December 2023. This set uniquely features track monitoring equipment.[29]