Name Official: | Centrale Nucléaire de Chinon |
Coordinates: | 47.2325°N 0.1703°W |
Country: | France |
Location: | Avoine, Indre-et-Loire |
Status: | Operational |
Construction Began: | 1957 |
Ps Units Operational: | 4 × 954 MW |
Ps Units Decommissioned: | 1 × 80 MW 1 × 230 MW 1 × 480 MW |
Np Reactor Type: | PWR |
Np Reactor Supplier: | Framatome |
Ps Cooling Towers: | 4 × Mechanical Draft |
Ps Units Manu Model: | Alstom |
Ps Electrical Capacity: | 3,816 |
Ps Annual Generation: | 23,925 |
Ps Electrical Cap Fac: | 71.6% |
Website: | Centrale nucléaire de Chinon |
The Chinon Nuclear Power Plant (fr|Centrale nucléaire de Chinon) is near the town of Avoine in the Indre et Loire département, on the river Loire[1] (approximately 10 km from the town of Chinon) in central France. The power station has seven reactors, of which three have been closed.
It employs approximately 1,350 full-time workers. The operator is Électricité de France (EDF).
The site houses three of the first generation of French plants, of UNGG-type (similar to the Magnox design), which have now closed. These reactors were named EDF1, EDF2, EDF3 and were later renamed into Chinon-A1, Chinon-A2, Chinon-A3.Four of the first French PWR series were later built on the site (Chinon-B1, Chinon-B2, Chinon-B3, Chinon-B4). The site has four cooling towers, specially designed to be low-profile in order to minimise the visual impact on the Loire.
It is larger than most French plants and feeds approximately 6% of French electricity demand.
Unit | Type | Net power | Total power | Construction start | Construction finish | Commercial operation | Shut down |
---|---|---|---|---|---|---|---|
Chinon A1 | 70 MW | 80 MW | 01.02.1957 | 14.06.1963 | 01.02.1964 | 16.04.1973 | |
Chinon A2 | UNGG | 210 MW | 230 MW | 01.08.1959 | 24.02.1965 | 24.02.1965 | 14.06.1985 |
Chinon A3 | UNGG | 480 MW | 480 MW | 01.03.1961 | 04.08.1966 | 04.08.1966 | 15.06.1990 |
Chinon B1 | 905 MW | 954 MW | 01.03.1977 | 30.11.1982 | 01.02.1984 | Qualified to operate until 2024 | |
Chinon B2 | PWR | 905 MW | 954 MW | 01.03.1977 | 29.11.1983 | 01.08.1984 | Qualified to operate until 2024 |
Chinon B3 | PWR | 905 MW | 954 MW | 01.10.1980 | 20.10.1986 | 04.03.1987 | Qualified to operate until 2027 |
Chinon B4 | PWR | 905 MW | 954 MW | 01.02.1981 | 14.11.1987 | 01.04.1988 | Qualified to operate until 2028 |