Cherrywood, Dublin Explained

Cherrywood
Native Name:Irish: Coill na Silíní
Settlement Type:Suburb
Pushpin Map:Ireland
Pushpin Label Position:right
Pushpin Map Caption:Location in Ireland
Subdivision Type:Country
Subdivision Name:Ireland
Subdivision Type1:Province
Subdivision Name1:Leinster
Subdivision Type2:Traditional county
Subdivision Name2:Dublin
Subdivision Type3:County / Local authority
Subdivision Name3:Dún Laoghaire–Rathdown
Established Date:1988
Leader Title1:Dáil Éireann
Leader Name1:Dún Laoghaire
Unit Pref:Metric
Population As Of:2006
Population Density Km2:auto
Coordinates:53.2446°N -6.1415°W
Elevation M:31
Area Code:01 (+3531)
Postal Code Type:Eircode (Routing Key)
Postal Code:D18
Blank Name:Irish Grid Reference

Cherrywood [1] is a developing suburb of Dublin, Ireland, bordering Cabinteely, Loughlinstown and Rathmichael. It is located to the southeast of the city, in Dún Laoghaire–Rathdown. The development commenced on a greenfield site in 1998 and primarily comprises Cherrywood Business Park and new residential and retail development. Development of the suburb stalled following the economic downturn, but resumed in the late 2010s and remains in continuous state of development as of late 2024.

Location

The modern development of Cherrywood is located on the old townlands of Cherrywood, Laughanstown and Glebe as well as parts of Brenanstown. It borders the modern day suburbs of Cabinteely, Loughlinstown, Rathmichael and Carrickmines.

It lies between the M50 motorway and the N11 road, about a kilometre north of where they fork from the M11. Cherrywood is divided by the R118 regional road which runs northeast to southwest through the area, crossing the N11 at Wyattville Road and joining the M50 at Junction 16.

To the south of this road lies the business park (originally 'Cherrywood Science and Technology Park' and later 'The Campus Cherrywood') as well as a number of mid-rise apartment buildings. The north side of the road is largely parkland and residential with a mixture of apartments and houses.

History

Pre-development

Evidence of human activity in the area dates to (at least) the Neolithic period, with the Brennanstown Portal Tomb dated to . Another wedge tomb in Laughanstown dates from either the late Neolithic or early Bronze Age. [2]

The ruined Tully Church at Laughanstown was established between the 6th and 9th centuries and remained in use until the 17th century.

Under fear of invasion by Napoleonic forces, a large army camp was established at Laughanstown in 1794 that is believed to have housed as many as 4,000 soldiers. Several roads were built connecting the camp to the coast at Killiney including the Military Road that runs through the crossroads ar Ballybrack before it was decommissioned in the 1810s.[3] [4]

The Harcourt Street railway line was built through the area in the 1850s. Trains passed over a large 5-arched viaduct at Bride's Glen, located directly to the south of the modern business park. The Harcourt Street Line was closed in 1858, and the viaduct remains disused.

Business park development

Cherrywood is being formed around the business park, in a deliberate process under a Cherrywood-Carrickmines Local Area Plan, the 2004 and later County Development Plans, and a related Cherrywood-Rathmichael Area Plan. Cherrywood is designated as a District Centre, and limits apply to certain forms of development there. In total the business park has an area of approximately 400 acres with, as of 2024, much of it still under development or undeveloped.[5]

The site where Cherrywood is located was rezoned for development by Dublin County Council in late 1993, at that time owned by Monarch Properties. [6] In 1998 the first office buildings were developed in what was then branded "Cherrywood Business Park". Development proceeded slowly and, as with other planned developments in Ireland, the property crash in 2008 affected Cherrywood.[7] In 2015, when several buildings were still empty while other planned developments were incomplete, some reports described parts of the development as a "ghost town".[8]

New management

In 2012, investors created a new management company to market the area again after the collapse of Liam Carroll's development company.[9] This was backed by AIB Bank and Danske Bank (parent company of National Irish Bank). Parts of the area received a facelift, and the "facilities building", which had previously only housed a food outlet, was expanded to include a gym.[10] Most of the main office buildings are owned by the same company.[11]

A new master plan was made[12] and approved by the local authority, including plans for over 1,200 apartments and over 500,000 square feet of commercial space, including a hotel.[13]

Rebranding and further development

Following a €145m acquisition by Spear Street Capital of the eight office blocks comprising the development in January 2018, the business park was rebranded as "The Campus Cherrywood". Proceeds from the deal were later used to develop the surrounding area.[14]

Plans to open a new life-sciences incubation and acceleration facility in the area were announced in October 2021.[15] The new facility was planned to provide 18 labs and 9 offices over 30,000 square feet of space, and create 100 jobs in the sector.[16]

Major tenants

The main tenant in the development is Dell, which has its "Dublin Campus" at Cherrywood. Other notable tenants include Aviva, Elavon, and Ireland-based multinational IT and consulting company, Accenture.[17] Mater Private opened a day hospital in Cherrywood in 2020.[18]

Transport

Luas

The Luas Green Line was extended from Sandyford to Cherrywood. Construction started in February 2007 and the line became operational on 16 October 2010.[19] There are three operational Luas stops in Cherrywood: Cherrywood, Laughanstown and the terminus at Brides Glen. A fourth stop was built at the northern edge of Cherrywood in Brenanstown but as of August 2024, has not yet been put into service. The Cherrywood stop is located where the line splits off from the original Harcourt Street railway line's alignment. The railway crossed through Cherrywood via the Brides Glen Viaduct.

Bus

The 111, 84, 84a and 7 bus routes all run through Cherrywood and terminate at Brides Glen Luas stop. Cherrywood is also served on the nearby N11 by frequent bus routes such as the 155 and 145, as well as the southbound 133 towards Wicklow

Amenities

As of August 2024, facilities included an all-weather multi-purpose playing pitch, a sports pavilion, tennis courts, cycle paths and greenways. More than 3,000 trees were planted in the creation of three parks. These three parks were named Beckett Park, Ticknick Park and Tully Park and were all officially opened together in May 2023 [20]

Cherrywood Educate Together National School, Cherrywood's first primary school, was completed in 2024, after opening in 2 phases. It has 24 classrooms.[21]

References

  1. Web site: Coill na Silíní / Cherrywood . Placenames Database of Ireland . logainm.ie . 26 October 2021 .
  2. Web site: Appendix B: Cultural and Built Heritage . DLR County Council . 15 September 2024.
  3. Web site: 1995:102 - LEHAUNSTOWN MILITARY CAMP, Lehaunstown/ Cherrywood, Dublin . excavations.ie . 15 September 2024.
  4. Web site: Lehaunstown . YouWho?.
  5. Web site: Dillon . Fiona . Cherrywood site of 400 acres is yours - if you have €220m . Irish Independent . 17 July 2014 . 16 September 2024.
  6. Web site: Lorna . Reid . Monarch 'did not suspect Dunlop bribed councillors' . Irish Independent . 4 July 2006 . 15 September 2024.
  7. Web site: Plans approved for €1 billion development in former ghost town Cherrywood . The Journal . thejournal.ie . 31 May 2018 . 7 March 2019 . Cherrywood never lived up to the Celtic Tiger hype that was promised – though the area drew in many residents, development there halted after the [2008] crash.
  8. Web site: There's a brand new plan to make former ghost town Cherrywood look more like New York . The Journal . thejournal.ie . 26 May 2015 . 7 March 2019 .
  9. Irishtimes: Cherrywood development to proceed, 9 May 2012. Visited: 31 May 2012
  10. Property.ie website on Facilities Building, visited 31-5-2012
  11. Offering of available commercial buildings on Cherrywood Dublin website
  12. http://www.cherrywooddublin.com/masterplan/ Master plan
  13. News: Barry . Aoife . Plans approved for €1 billion development in former ghost town Cherrywood . 26 October 2021 . thejournal.ie . Journal Media . 31 May 2018.
  14. Web site: Hines secures €145m from sale of Cherrywood offices. 2021-10-26. independent. 18 January 2018 . en.
  15. News: O'Brien. Ciara. New life sciences incubation and acceleration facility to open in Dublin. 2021-10-26. The Irish Times. en.
  16. Web site: Goodbody. Will. 2021-10-06. 100 new jobs at life sciences incubator and accelerator. en . rte.ie .
  17. Web site: Office Occupiers - Office to rent Dublin. 2021-10-26. The Campus Cherrywood. en-GB.
  18. Web site: Mater Private opens two new day hospitals in Dublin . Irish Times . 1 September 2024.
  19. http://www.transport21.ie/Projects/Metro_-_Luas/Luas_Line_B1_-_Sandyford_to_Cherrywood.html LUAS extension
  20. Web site: Three new parks open at Cherrywood . DLR County Council . 31 August 2024.
  21. Web site: Cherrywood Educate Together National School, Dublin . Glasgiven Contracts Ltd. . 5 September 2024.

Sources