Chengdu–Dazhou–Wanzhou high-speed railway 成达万高速铁路 | |
Status: | Under construction |
Start: | Tianfu |
End: | Wanzhou North |
Stations: | 13 |
Operator: | China Railway Chengdu Group |
Linelength: | 4770NaN0 |
Speed: | 3500NaN0 |
Map State: | collapsed |
The Chengdu–Dazhou–Wanzhou high-speed railway or Chengdawan HSR is a high-speed railway currently under construction in China. This line forms part of the Shanghai–Chongqing–Chengdu high-speed railway.
This railway was planned as early as 2015.[1] Construction began on 30 September 2022.[2]
The section between Tianfu and Tianfu Airport is shared with the Chengdu–Zigong high-speed railway.
--! colspan="2" | Route--> | Station No.--> | Station Name | Chinese | Distance --> | Metro transfers/connections | China Railway transfers/connections--> | Location--> | ||
---|---|---|---|---|---|---|---|---|---|---|
Tianfu | ||||||||||
Tianfu Airport | ||||||||||
Ziyang West | ||||||||||
Lezhi | ||||||||||
Suining | ||||||||||
Pengxi South | ||||||||||
Nanchong North | ||||||||||
Yingshan West | ||||||||||
Quxian North | ||||||||||
Dazhou South | ||||||||||
Kaijiang South | ||||||||||
Yuexi | ||||||||||
Wanzhou North |