Bridge Name: | Chelsea Street Bridge |
Crosses: | Chelsea River |
Design: | Vertical-lift bridge |
Clearance: | (raised) |
Begin: | October 28, 2008[1] |
Complete: | Summer 2013 |
Cost: | $125,491,530.96 |
Open: | May 12, 2012 |
Followed: | Andrew McArdle Bridge |
Coordinates: | 42.3863°N -71.0227°W |
The Chelsea Street Bridge is a vertical-lift bridge that carries Chelsea Street between East Boston, Massachusetts, and Chelsea, Massachusetts, over the Chelsea Creek. It opened to traffic on May 12, 2012, after a $125.3M construction project replaced the previous bridge,[2] [3] a single-leaf bascule-type drawbridge.[4] The span is with a vertical clearance, when opened, of . There are two lanes and a sidewalk in each direction.[5]
The current bridge is the latest in a succession of bridges at the same site going back to 1834.[6] The most recent predecessor was a single-leaf bascule bridge on which construction began in 1936 and which was opened on May 10, 1937.[6]
The Chelsea Street Bridge is used by the MBTA Silver Line SL3 route, which began service in April 2018. Frequent openings of the bridge — as many as ten per day — have caused numerous delays.[7] Ships and barges carry petroleum products to tank farms upstream from the bridge and each delivery can cause at least two bridge openings as tug boats come and go. Federal regulations give priority to marine traffic and require the bridge to be opened on demand.[7] [8]