AEC | |
Style: | Ahmedabad Metro |
Address: | Dharm Nagar II, Sabarmati, Ahmedabad, Gujarat 380005 |
Coordinates: | 23.0751°N 72.5932°W |
Owned: | Gujarat Metro Rail Corporation Limited |
Operator: | Ahmedabad Metro |
Platforms: | Side platform Platform-1 → Sector-1 / Platform-2 → APMC |
Tracks: | 2 |
Structure: | Elevated, Double track |
Levels: | 2 |
Accessible: | Yes |
Status: | Operational |
Electrified: | 750 V DC third rail |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
AEC is an elevated metro station on the North-South Corridor of the Red Line of Ahmedabad Metro in Ahmedabad, India.[1] Around this metro station holds the main and upcoming Sabarmati HSR Terminal railway station along with AEC Garden Park and Torrent Power Limited.
This phase of the metro system was inaugurated on 30 September 2022 by Prime Minister Narendra Modi and was opened to the public on 6 October 2022.[2] [3] [4] [5]
G | Street level | Exit/Entrance | |||
valign=top | L1 | valign=top | Mezzanine | valign=top | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left |-|style="border-bottom:solid 1px gray;" width=100|Platform 2 Southbound|style="border-bottom:solid 1px gray;" width=500|Towards → APMC Next Station: Sabarmati Railway Station|-|Platform 1 Northbound|Towards ← Sector-1Next Station: Sabarmati|-|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" colspan=2 align=center|Side platform | Doors will open on the left |